| Published Date |
Date of Sale of
Tender From - To |
Last Date of
Receipt |
Tender No. |
Subject |
|
30.04.2013 |
02.05.2013 to 09.05.2013 |
13.05.2013 (15:00 Hrs.) |
HWP(K)/CIVIL/COLONY/C-05/04/2013 Estimated Cost:
15,74,817/- |
Carpentry, Plumbing, Masonry, Welding,
Painting, Data Operation, Site Supervision and Stores Handling
Jobs at HWPK Housing Colony, Rawatbhata for the year 2013-2014. |
|
22.04.2013 |
22.04.2013 to 08.05.2013 (Between 10:00 Hrs. to 15:00 Hrs.) |
10.05.2013 (Between 09:00 Hrs. to 14:00 Hrs.) |
HWPM/CIVIL/CPP-6/2013/07 Estimated Cost:
6.20 Lakhs |
Repair and Maintenance Works in Administration building at HWPM
- False ceiling in Accounts Section. |
|
22.04.2013 |
22.04.2013 to 08.05.2013 (Between 10:00 Hrs. to 15:00 Hrs.) |
10.05.2013 (Between 09:00 Hrs. to 14:00 Hrs.) |
HWPM/CIVIL/CPP-6/2013/08 Estimated Cost:
7.30 Lakhs |
Repair and Maintenance Works in Administration building at HWPM
- Replacement of partition and windows. |
|
04.04.2013 |
20.04.2013 (10:00 Hrs.) to 03.05.2013 (15:00 Hrs.) |
09.05.2013 Between 09:00 Hrs. to 14:00 Hrs. |
HWPM/M-P/MISC/35/2012 Estimated Cost:
1,50,000/- |
Lube Oil Wear Particle Analysis of Critical Rotating Equipments
in Main Plant & CPP of HWP(M). |
|
15.04.2013 18.04.2013 for Corrigendum-1 |
15.04.2013 20.04.2013 (10:00 Hrs.) to 24.04.2013
30.04.2013(15:00 Hrs.) |
30.04.2013 07.05.2013(14:30 Hrs.)Date of Pre-bid clarification:
25.04.2013 02.05.2013 (10:00 Hrs.) to 26.04.2013
03.05.2013 (16:00 Hrs.) |
HWPK/ELECT/COLONY/ 2013/201 205
Corrigendum-1 to
NIT in Hindi
Corrigendum-1 to
NIT in English
Estimated Cost:
11,94,660/- |
Maintenance and replacement of electrical fittings / accessories
in street lighting installations, residential quarters and
public buildings of HWP (Kota) colony, Rawatbhata for one year. |
|
04.04.2013 |
04.04.2013 (10:00 Hrs.) to 16.04.2013 (15:00 Hrs.) |
02.05.2013 (14:30 Hrs.) Date of Pre-bid clarification:
17.04.2013 (10:00 Hrs.) to 25.04.2013 (16:00 Hrs.) |
HWPK/Mech/2013/112 Estimated Cost:
14,94,432/- |
Annual Rate Contract for painting of exterior surface of pipes,
tanks, pipe supports & equipments etc. at HWPK Site. |
|
16.04.2013 |
19.04.2013 to 25.04.2013 |
29.04.2013 (15:00 Hrs.) |
HWP(K)/CIVIL/COLONY/C-06/02/2013 Estimated Cost:
15,88,456/- |
Annual Maintenance of Lawns & Gardens & Planting of Trees in
HWP(K) Housing Colony for the year 2013-2014. |
|
08.04.2013 |
11.04.2013 (10:00 Hrs.) to 24.04.2013 (15:00 Hrs.) |
29.04.2013 (14:30 Hrs) Date of Pre-bid clarification:
25.04.2013 (10:00 Hrs.) to 27.04.2013 (16:00 Hrs.) |
HWPK/MECH/2013/116 Estimated Cost:
33,29,000/- |
Retrofitting of sand filter back wash pumps
including supply of pipes and pipe fittings, fabrication,
welding & erection of pipelines, making trenches, RCC pedestals
and pipe support structural work at HWP(Kota) site. |
|
19.02.2013 08.03.2013 for Corrigendum-1 |
18.02.2013 to 08.03.2013 08.04.2013 |
28.03.2013 29.04.2013 (15:00 Hrs.)
Date of Pre-bid clarification:
18.02.2013 to 23.02.2013 31.03.2013 |
HWPT/Admn/Hosp/2013/1
Corrigendum-1 to
NIT
Estimated Cost:
1,20,00,000/- |
Supply of medicines by running of Dispensary at HWP Housing
Colony. |
|
03.04.2013 |
08.04.2013 (10:00 Hrs.) to 17.04.2013 (15:00 Hrs.) |
25.04.2013 (15:00 Hrs.) |
HWB/CIVIL/CO/13/04 Estimated Cost:
30,87,000/- |
Painting of Industrial Structures for Technology Demonstration
Plant at RCF, Chembur, Mumbai. |
|
22.03.2013 |
27.03.2013 to 20.04.2013 |
24.04.2013 14:00 Hrs. |
SALE OF SODIUM SULPHATE POWDER ON
AS-IS-WHERE-IS BASIS. |
SALE OF SODIUM SULPHATE POWDER ON AS-IS-WHERE-IS BASIS. |
|
08.04.2013 |
06.04.2013 (10:00 Hrs.) to 15.04.2013 (15:00 Hrs.) |
20.04.2013 (14:30 Hrs.) Date of Pre-bid clarification:
16.04.2013 (10:00 Hrs.) to 17.04.2013 (16:00 Hrs.) |
HWPK/CIVIL/2013/402 Estimated Cost:
12,26,600/- |
Renovation of VFD rooms at HWP (Kota) in the year 2013. |
|
25.03.2013 |
25.03.2013 (10:00 Hrs.) to 05.04.2013 (15:00 Hrs.) |
16.04.2013 (15:00 Hrs.) |
HWB/CIVIL/CO/13/01 Estimated Cost:
10,45,000/- |
Miscellaneous civil maintenance works in TDP
at RCF Chembur for year 2013-14. |
|
22.03.2013 |
30.03.2013 to 11.04.2013 Between 10:00 Hrs. to 15:00 Hrs. |
12.04.2013 Between 09:00 Hrs. to 14:00 Hrs. |
HWPM/COLONY/CIVIL/ 2013/01 Estimated Cost:
9,80,000/- |
Miscellaneous Masonry works in HWP(M) Colony
for the year 2013-2015. |
|
12.03.2013 25.03.2013 for Corrigendum -1 |
12.03.2013 to 28.03.2013 09.04.2013 (16:00 Hrs.) |
01.04.2013 11.04.2013 (15:00 Hrs.) |
HWPK/ELECT/LOCB/2013
Corrigendum-1 to NIT
Estimated Cost:
5,07,968/- |
Servicing of NGEF make 6.6 KV, Low Oil Content Circuit Breakers
at HWP(K) Site. |
|
19.03.2013 |
20.03.2013 (10:00 Hrs.) to 04.04.2013 (15:00 Hrs.) |
10.04.2013 (14:30 Hrs.) Date of Pre-bid clarification:
05.04.2013 (10:00 Hrs.) to 09.04.2013 (16:00 Hrs.) |
HWPK/MECH/2013/117 Estimated Cost:
1922000/- |
Fabrication, welding, erection and supply of pipelines and
structure for New Heavy Water Storage tanks. |
|
22.03.2013 |
01.04.2013 to 06.04.2013 Between 10:30 Hrs. to 15:00 Hrs. |
08.04.2013 Between 10:30 Hrs. to 14:00 Hrs. |
HWP(M)/AD/EM/Shops/01/2013 |
Allotment of the Shops at the Shopping Complex, HWP (Manuguru)
Colony. |
|
18.03.2013 |
20.03.2013 (10:00 Hrs.) to 28.03.2013 (15:00 Hrs.) |
04.04.2013 (14:30 Hrs.) Date of Pre-bid clarification:
28.03.2013 (10:00 Hrs.) to 30.03.2013 (16:00 Hrs.) |
HWPK/SAFETY/2013/501 Estimated Cost:
6,15,694/- |
Annual Contract for handling and maintenance of various safety
appliances in round the clock shift and general shift at HWPK. |
|
19.03.2013 |
19.03.2013 (10:00 Hrs.) to 24.03.2013 (15:00 Hrs.) |
28.03.2013 (14:30 Hrs.) Date of Pre-bid clarification:
26.03.2013 (10:00 Hrs.) to 27.03.2013 (16:00 Hrs.) |
HWP(K)/Admn/IRC/02/2013 Estimated Cost:
5,20,479/- |
Providing Manpower for Housekeeping and Cleaning Services to
HWPK Canteen. |
|
06.03.2013 |
06.03.2013 to 25.03.2013 |
25.03.2013 14:30 Hrs. |
HWP/B/S/6620/2012/ TRANSPORT Estimated Cost:
65,00,000/- |
HIRING OF THREE MINI BUSES OF 2010-2011 OR SUBSEQUENT MODEL WITH
MINIMUM 25 SEATING CAPACITY FOR HWP(BARODA) IN GENERAL SHIFT AND
TWO MINI BUSES WITH 25 CAPACITY IN RTC SHIFT. |
|
29.01.2013 28.02.2013 for Corrigendum-1 |
01.02.2013 (10:00 Hrs.) to 18.02.2013 12.03.2013 (15:00 Hrs.) |
06.03.2013 25.03.2013 15:00 Hrs. |
HWB/BKJ/2012/SOLAR/ HWPM/RFP-PHASE-2 Estimated Cost:
106 Crore
Corrigendum-1 to
NIT in English
Corrigendum-1 to
NIT in Hindi |
Design, Engineering, Manufacturing, Supply, Erection, Testing
and Commissioning of 12 MWp (DC rating) poly crystalline solar
technology grid interactive solar PV power plant including 5
years operation and maintenance of the same on turnkey (EPC)
basis at HWP, Manuguru (AP). |
|
25.02.2013 |
25.02.2013 (10:00 Hrs.) to 12.03.2013 (15:00 Hrs.) |
19.03.2013 14:30 Hrs. Date of Pre-bid clarification:
13.03.2013 (10:00 Hrs.) to 15.03.2013 (16:00 Hrs.) |
HWPK/ELECT/2012/204/A Estimated Cost:
19,30,150/- |
Reconditioning of existing earth pits,
earthing grid and making of new earth pits at HWP (K) Site. |
|
13.03.2013 |
25.02.2013 (10:00 Hrs.) to 08.03.2013 (15:00 Hrs.) |
15.03.2013 (15:00 Hrs.) |
HWB/CIVIL/M/13/03
Pre-Bid
Clarifications |
Civil Work for Mist Cooling System and Hot Water Fired VAM at
HWP (Manuguru). |
|
14.02.2013 |
23.02.2013 (10:00 Hrs.) to 14.03.2013 (15:00 Hrs.) |
15.03.2013 Between 09:00 Hrs. to 14:00 Hrs. |
HWPM/COLONY/CIVIL/2012 /19(2nd Call) Estimated Cost:
9,25,700/- |
Grass cutting around the public, residential blocks, road berms
& play grounds in HWPM colony for the year 2013-13. |
|
14.02.2013 |
01.03.2013 (10:00 Hrs.) to 14.03.2013 (!5:00 Hrs.) |
14.03.2013 14:30 Hrs. |
HWPM/CIVIL/G-55/2013/03 Estimated Cost:
25.30 Lakhs |
Mist cooling system at ETP in HWPM. |
|
16.01.2013 12.02.2013 for Corrigendum-1 |
17.01.2013 (10:00 Hrs.) to 02.02.2013 20.02.2013 (15:00 Hrs.) |
19.02.2013 12.03.3013 14:30 Hrs.Date of Pre-bid clarification:
04.02.2013 25.02.2013
(10:00 Hrs.) to 12.02.2013 04.03.2013 (16:00 Hrs.) |
HWPK/MECH/2013/101 Estimated Cost:
21,50,000/-
Corrigendum-1 to
NIT |
Development, Fabrication, Inspection,
Testing, Supply & Guarantee of suction / discharge valves of
31K1 Reciprocating Nitrogen Gas Compressor. |
|
28.02.2013 |
27.02.2013 (10:00 Hrs.) to 05.03.2013 (15:00 Hrs.) |
08.03.2013 14:30 Hrs. Date of Pre-bid clarification:
06.03.2013 (10:00 Hrs.) to 07.03.2013 (16:00 Hrs.) |
HWP(K)/Admn/IRC/01/2013 Estimated Cost:
5,20,479/- |
Providing Manpower for Housekeeping and Cleaning Services to
HWPK Canteen. |
|
12.02.2013 |
18.02.2013 to 28.02.2013 (10:00 Hrs. to 15:00 Hrs.) |
01.03.2013 Between 09:00 Hrs. to 14:00 Hrs. |
HWPM/CIVIL/CPP-6/2013/05 Estimated Cost:
7.78 |
Clearing of grass and pruning of trees in CPP area during the
year 2013-14 at HWPM. |
|
11.02.2013 |
18.02.2013 (10:00 Hrs.) to 28.02.2013 (15:00 Hrs.) |
01.03.2013 Between 09:00 Hrs. to 14:00 Hrs. |
HWPM/CIVIL/CPP-6/2013/04 Estimated Cost:
5.41 Lakhs |
Providing and laying concrete pedestals for LP steam header in
HWPM. |
|
14.02.2013 |
15.02.2013 to 22.02.2013 |
25.02.2013 15:00 Hrs. |
HWPK/PROD/5-A/2012/758 Estimated Cost:
1,70,830/- |
Removal, cleaning & re-fixing of structure
packing and distributors in Vacuum Degasser (7114 DT2) and
packing replacement of Purge Towers (3725 PT1 & 3725 PT2) and
Product Stripper (3605 PS1) |
|
11.02.2013 |
10.02.2013 to 20.02.2013 |
25.02.2013 15:00 Hrs. |
HWB/CIVIL/CO/13/2 Estimated Cost:
5.00 Lakhs |
Repairs to Chain link fencing and windows
grills in TDP, RCF Chembur. |
|
05.02.2013 |
11.02.2013 to 21.02.2013 |
25.02.2013 14:00 Hrs. |
HWPT/CIVIL/COLONY /01/13 Estimated Cost:
6,78,300/- |
House keeping of the vacant areas and
staircase areas of residential blocks at HWP(T) colony for the
year 2013-14. |
|
31.01.2013 |
01.02.2013 (10:00 Hrs.) to 11.02.2013 (15:00 Hrs.) |
19.02.2013 14:30 Hrs.
Date of Pre-bid clarification: 12.02.2013
(10:00 Hrs.) to 14.02.2013 (16:00 Hrs.) |
HWPK/CIVIL/2012/406 Estimated Cost:
17,82,093/- |
Repair of flooring and replacement of regeneration effluent
drain Header Line in WTP area during MTA-2013 at HWPK. |
|
31.01.2013 |
01.02.2013 (10:00 Hrs.) to 11.02.2013 (15:00 Hrs.) |
19.02.2013 14:30 Hrs.
Date of Pre-bid clarification: 12.02.2013
(10:00 Hrs.) to 14.02.2013 (16:00 Hrs.) |
HWPK/CIVIL/2012/405 Estimated Cost:
16,90,000/- |
Repair of H2S plant effluent Dyke
(Conditioning pit), Construction of foundation of H.P.Seal Pot
and Repair of RAPS Steam pipeline support for MTA-2013 at HWPK. |
|
05.02.2013 11.02.2013 for Corrigendum |
05.01.2013 (10:00 Hrs.) to 15.02.2013 (14:29 Hrs.) |
15.02.2013 14:30 Hrs. |
HWP/B/S/6620/2012/ TRANSPORT/01
Corrigendum to
NIT
Estimated Cost:
55,00,000/- |
Hiring of three mini
buses / city rider of 2010/2011 model or subsequent model with
minimum 20 seating capacity for commuting of HWP (Baroda)
employees in general shift / RTC shift. |
|
29.01.2013 |
31.01.2013 to 14.02.2013 |
18.02.2013 15:00 Hrs. |
HWP(K)/PROD/01/2013/461 Estimated Cost:
4,41,500/- |
"Annual Maintenance of Sewage Treatment Plant and Cleaning /
Parking of Solar Discs of Solar Steam Generation Plant" at HWPK
Plant Site. |
|
22.01.2013 |
25.01.2013 to 14.02.2013 |
18.02.2013 14:00 Hrs. |
HWP/CIVIL/PLANT/22/12 Estimated Cost:
7,07,000/- |
Fencing works at Heavy Water Plant, Tuticorin. |
|
09.01.2013 01.02.2013 for Corrigendum-1 |
10.01.2013 (10:00 Hrs.) to 24.01.2013 07.02.2013 (15:00 Hrs.) |
30.01.2013 12.02.2013 14:30 Hrs.
Date of Pre-bid clarification: 25.01.2013
08.02.2013 (10:00 Hrs.) to
29.01.2013 11.02.2013 (16:00 Hrs.) |
HWPK/Mech/2012/113
Corrigendum-1 to
NIT
Estimated Cost:
12,24,000/- |
Fabrication, welding, erection & insulation
of pipelines for laying out of new additional LPG piping from
LPG storage Tanks to LP & HP flare stack at HWPK Site. |
|
21.01.2013 |
23.01.2013 (10:00 Hrs.) to 05.02.2013 (15:00 Hrs.) |
11.02.2013 (14:30 Hrs.) Date of Pre-bid clarification: 06.02.2013
(10:00 Hrs.) to 08.02.2013 (16:00 Hrs.) |
HWPK/MECH/2012/114 Estimated Cost:
2400000/-
|
Fabrication, welding & erection of pipelines & fittings for
installation of new wafer type transmitters in Towers & other
misc. welding jobs during MTA-13 at HWPK Site. |
|
07.01.2013 30.01.2013 for Corrigendum-1 |
07.01.2013 to 24.01.2013 between 11:00 Hrs. to 16:00 Hrs. |
31.01.2013 07.02.2013 15:00 Hrs. |
HWPK/Mech/HEWAC-H2
Comp/2013-01
Corrigendum-1 to
NIT
Estimated Cost:
2,25,000/- |
"Re-babbiting of main bearings of H2
Compressor of HEWAC and subsequent machining to get required
dimensions" at HWPK Site. |
|
07.01.2013 |
24.01.2013 to 28.01.2013 between 13:30 Hrs. to 14:30 Hrs. |
05.02.2013 14:30 Hrs. |
HWP:TAL:MAINT(E):2013:01 |
Annual Oil Sample Testing of Transformers. |
|
07.01.2013 28.01.2013 for Corrigendum-1 |
08.01.2013 to 18.01.2013 31.01.2013 between 11:00 Hrs. to 16:00 Hrs. |
21.01.2013 03.02.2013 14: 30 Hrs. |
HWPK/Mech/2012
Corrigendum-1 to
NIT
Estimated Cost:
4,60,000/- |
Annual rate contract for Maintenance and repair of hot and cold
insulation work on equipments, exchangers and piping etc. of
HEWAC at HWP(K) Site. |
|
10.01.2013 |
10.01.2013 to 28.01.2013 |
31.01.2013 15:00 Hrs. Date of Pre-bid clarification: 27.01.2013
(11:00 Hrs.) |
HWP(K)/Admn/GH/01/2013 |
Notice Inviting Bids/Offers for "Purchase of Residential Flats
by Heavy Water Plant (Kota)." |
|
31.12.2012 21.01.2013 for Corrigendum-1 |
31.12.2012 to 10.01.2013 25.01.2013 |
15.01.2013 30.01.2013 14:30 Hrs. |
HWPK/Mech/WS/2012
Corrigendum-1 to
NIT
Estimated Cost:
71,000/- |
Servicing and Load testing of chain pulley blocks, Fork lifts,
Jib Crane, E O T & Mobile Cranes at HWPK Site. |
|
07.01.2013 |
09.01.2013 to 22.01.2013 between 10:00 Hrs. to 15:00 Hrs. |
25.01.2013 14:30 Hrs. Date of Pre-bid clarification: 24.01.2013
(10:00 Hrs.) to 24.01.2013 (15:00 Hrs.) |
HWPM/CIVIL/MP-09/2012/41 Estimated Cost:
16,70,000/- |
Miscellaneous civil maintenance works in MP
area for the year 2012-13 at HWPM. |
|
08.01.2013 |
04.01.2013 (10:00 Hrs.) to 15.01.2013 (15:00 Hrs.) |
23.01.2013 14:30 Hrs.
Date of Pre-bid clarification: 16.01.2013 (10:00 Hrs.) to
18.01.2013 (16:00 Hrs.) |
HWPK/Mech/2012/111 Estimated Cost:
24,87,839/- |
Maintenance work of piping supports such as sliding supports,
elbow anchors, spring supports, turn buckles, clamps etc. during
MTA-2013 at HWPK Site. |
|
24.12.2012 |
01.01.2013 to 16.01.2013 upto 16:00 Hrs. |
23.01.2013 14:30 Hrs. |
HWP(K)/I&C/AMC/TATA/2013 Estimated Cost:
2,12,000/- |
Comprehensive Annual Maintenance Contract of Tata make telephone
exchange model IDX 1250 and Removal of Tata make telephone
exchange model IDX 1250 from HWPK site and arrangement for
shifting of this exchange to HWPK colony, installation and
commissioning of system. |
|
19.12.2012 |
01.01.2013 to 18.01.2013 |
22.01.2013 14:30 hrs. |
HWPK/Mech/2012/SG-03 Estimated Cost:
9,28,800/- |
Development, Fabrication, Inspection, Testing, Supply &
Guarantee of suction / discharge valves of 3816 C1/C2
Reciprocating H2S Gas Compressors at HWPK Site. |
|
26.12.2012 11.01.2013 (for corrigendum 1) |
26.12.2012 to 07.01.2013 15.01.2013 between 10:00 Hrs. to 15:00 Hrs. |
18.01.2013 14:30 Hrs. Date of Pre-bid clarification: 08.01.2013
16.01.2013
(10:00 hrs.) to 10.01.2013 17.01.2013 (16:00 hrs.) |
HWP/K/CIVIL/P-8/2012/403 Estimated Cost:
17,82,093/-
Corrigendum-1 to NIT |
Repair of flooring and replacement of
regeneration effluent drain Header Line in WTP area during
MTA-2013 at HWPK. |
|
03.12.2012 21.12.2012 (for corrigendum 1) |
01.12.2012 to 11.12.2012 29.12.2012 15.01.2013 |
27.12.2012 03.01.2013 18.01.2013 14:30 hrs.Date of Pre-bid clarification:
11.12.2012 26.12.2012
16.01.2013 to 19.12.2012
29.12.2012 17.01.2013 (10:00 hrs. to 16:00 hrs.) |
HWPK/CIVIL/2012/401 Estimated Cost:
16,90,000/-
Corrigendum-1 to NIT
Corrigendum-2 to NIT
|
Repair of H2S Plant effluent dyke (Conditioning pit),
Construction of foundation of H.P.Seal Pot and Repair of RAPS
steam pipeline support for MTA-2013 at HWPK. |
|
17.12.2012 |
17.12.2012 to 07.01.2013 |
15.01.2013 14:30 hrs. Date of Pre-bid clarification: 08.01.2013
(10:00 hrs.) to 11.01.2013 (16:00 hrs.) |
HWPK/ELECT/2012/104 Estimated Cost:
19,30,150/- |
Reconditioning of existing earth pits, earthing grid and making
of new earth pits at HWP(K) Site. |
|
24.12.2012 |
24.12.2012 to 09.01.2013 between 10:00 Hrs. to 15:00 Hrs. |
11.01.2013 14:00 Hrs. |
HWPM / CIVIL /MP-9/2012/42
Estimated Cost:
8,00,000/- |
Repairs to the damaged plinth protection, rain water pipes and
other works at HWPM main plant. |
|
21.12.2012 |
24.12.2012 to 09.01.2013 (between 10:00 hrs to 15:00 hrs) |
11.01.2013 14:00 hrs. |
HWPM/CIVIL/MP-17/2012/28 (2nd call)
Estimated Cost:
5.4 Lakhs |
Replacement of roofing in EBP, Non AC sheet cladding &
Miscellaneous works in BCP at HWPM. |
|
14.11.2012 (Corrigendum-1)
(12.12.2012 for Corrigendum-2) 02.01.2013 (Corrigendum 3) |
15.11.2012 to 30.11.2012 10.12.2012
24.12.201204.01.2013
15:00 Hrs |
14.12.2012 19.12.2012 02.01.2013
07.01.2013 14:30 hrs.
Date of Pre-bid clarification: 30.11.2012
12.12.2012 24.12.2012 04.01.2013 10:00 hrs. to 07.12.2012 19.12.2012
27.12.2012
06.01.2013 16:00 hrs. |
HWPK/MECH/2012/106 Estimated Cost:
1,32,00,000/-
Corrigendum-1
to NIT
Corrigendum-2 to NIT
Corrigendum-3 to NIT |
Maintenance contract for insulation work on Towers, Tanks,
Exchangers and Piping etc. during EMTA-13 at HWP (K) Site. |
|
20.12.2012 |
01.01.2013 to 03.01.2013 |
07.01.2013 14:30 hrs. |
HWP/TAL/MECH/2012/21
Estimated Cost:
8.20 Lakhs |
Maintenance of machines and equipments in existing facilities
for production of solvents. |
|
04.12.2012 |
10.12.2012 to 29.12.2012 |
05.01.2013 15:00 hrs. |
HWP(K)/Mech/AC/2012/08 Estimated Cost:
3,98,575/- |
Overhauling of compressors of central air conditioning plants
including air handling units, supply of spares including
testing, installation, commissioning & operational guarantee at
HWPK Site. |
|
03.12.2012 |
10.12.2012 to 24.12.2012 |
04.01.2013 14:30 hrs. Date of Pre-bid clarification:
26.12.2012 to 29.12.2012 (10:00 hrs. to 16:00 hrs.) |
HWPK/MECH/2012/110 Estimated Cost:
23,16,000/- |
Supply, removal, fabrication, welding & erection of new steel
structures, demolishing old RCC pedestals, excavation &
construction of new RCC pedestals work at HWPK Site. |
|
10.12.2012 |
14.12.2012 to 28.12.2012 |
02.01.2013 15:00 hrs. |
HWP(K)/PROD/07/2012/5437 Estimated Cost:
7,66,000/- |
Operation work of shifting of cylinders, wetting of cooling
tower wooden structure & its fillings, handling of filled &
empty drums, preparation of bleaching powder and digging &
shifting of Sodium Sulphate (Glauber slat) in tanks. |
|
03.12.2012 |
01.12.2012 to 11.12.2012 |
27.12.2012 14:30 hrs. Date of Pre-bid clarification:
17.12.2012 to 19.12.2012 (10:00 hrs. to 16:00 hrs.) |
HWPK/CIVIL/2012/402 Estimated Cost:
12,54,913/- |
Uprooting rank vegetation, wild growth and Grass cutting and
area development work at HWP (K) Anushakti for the year
2012-2013. |
|
06.12.2012 |
06.12.2012 to 22.12.2012 |
26.12.2012 15:00 hrs. |
HWPK/Mech/2012/107 Estimated Cost:
6,75,000/- |
Remote Visual Inspection of large dia gas lines and drain lines
of XU towers and tanks at HWPK Site during ATA-2013. |
|
19.11.2012 |
21.11.2012 to 07.12.2012 15.12.2012 |
18.12.2012 14:30 hrs. 24.12.2012 14:30 hrs.Date of Pre-bid clarification: 07.12.2012
10:00 hrs. to 13.12.2012 20.12.2012 16:00 hrs. |
HWPK/MECH/2012/104 Estimated Cost:
20,00,000/-
Corrigendum-1 to NIT |
Phased Array Ultrasonic Testing of weld joints of XU
Towers/pipelines at HWPK site during ATA-2013. |
|
27.11.2012 |
28.11.2012 to 12.12.2012 |
26.12.2012 14:30 hrs. |
HWPK/TSS/2012/02 Estimated Cost:
65,000/- |
Witnessing the Statutory Testing of Safety Relief Valves as per
SMPV(U) Rule-18 at HWPK site. |
|
09.11.2012 (27.11.2012 for Corrigendum) (04.12.2012 for
Corrigendum-2) |
12.11.2012 to 26.11.2012 03.12.2012 12.12.2012
|
04.12.2012 14:30 hrs. 10.12.2012 14:30 hrs. 19.12.2012 14:30 hrs.Date of Pre-bid clarification:
26.11.2012
10:00 hrs. to 30.11.2012 16:00 hrs. 03.12.2012 to
06.12.2012 (10:00 hrs. to 16:00 hrs.)
12.12.2012 to
15.12.2012 (10:00 hrs. to 16:00 hrs.) |
HWPK/ELECT/2012/202 Estimated Cost:
32,88,524
Corrigendum to
NIT
Corrigendum -2 to
NIT |
Handling, shifting, servicing and testing of
various horse power rating 415 volt and 6600 volt electric
motors at HWP(K) during Major Turn Around 2013 (MTA-2013). |
|
21.11.2012 |
23.11.2012 to 10.12.2012 |
19.12.2012 14:30 hrs. Date of Pre-bid clarification: 10.12.2012
10:00 hrs. to 13.12.2012 16:00 hrs |
HWPK/Mech/2012/109 Estimated Cost:
26,37,000/- |
Maintenance and testing of Large size DD
valves sizes ranging from 12" NB - 36" NB at HWP, Kota during
MTA-13. |
|
19.11.2012 |
20.11.2012 to 05.12.2012 |
18.12.2012 14:30 hrs. Date of Pre-bid clarification: 05.12.2012
10:00 hrs. to 11.12.2012 16:00 hrs |
HWPK/MECH/2012/108 Estimated Cost:
29,74,000/- |
Maintenance and testing of small size DD valves sizes ranging
from 1-1/2" NB - 10" NB at HWP, Kota during MTA-13. |
|
15.11.2012 |
15.11.2012 to 05.12.2012 |
15.12.2012 14:30 hrs.
Date of Pre-bid clarification: 06.12.2012
10:00 hrs. to 10.12.2012 16:00 hrs |
HWPK/MECH/2012/102 Estimated Cost:
74.19 Lac |
Removal, Maintenance, Testing & Re-installation of Gate, Globe,
Check, Plug Valves, Ball Valve, Butterfly Valves at HWPK Site
during MTA-12. |
|
17.10.2012 |
02.11.2012 to 17.11.201217.11.2012 to 07.12.2012 |
21.11.2012 15:00 hrs.15.12.2012 14:30 hrs. |
HWPK/INST/TEND/2013 Estimated Cost:
5,94,000/-
Corrigendum to NIT |
1. Servicing of Limitorque Actuators (Air Filter & lubricators,
four way valves, poppet valves, limit switches / torque switches
checking & its replacement, limit gear trains, hand wheel
assembly, clutch assembly & air motors), removal of existing old
grease and filling of new grease and
2. Servicing of 1/2" 800# SS screw end, end connection - 1/2"
NPT (F) gate valves. |
|
08.11.2012 (27.11.2012 for Corrigendum) |
09.11.2012 to 28.11.2012 06.12.2012 |
06.12.2012 14:30 hrs. 14.12.2012 14:30 hrs.Date of Pre-bid clarification:
29.11.2012
10:00 hrs. to 06.12.2012 16:00 hrs 06.12.2012 to
10.12.2012 (10:00 hrs. to 16:00 hrs.) |
HWPK/ELECT/2012/201 Estimated Cost:
26,58,656/-
Corrigendum to
NIT |
Supply & Installation of Lighting Transformers & Lighting
distribution Boards at HWPK. |
|
22.11.2012 |
26.11.2012 to 08.12.2012 |
13.12.2012 14:00 hrs. |
HWPK/HK/01/2013 Estimated Cost:
5,26,792/- |
Cosmetic Maintenance Work related to cleaning of toilets,
washbasins, cleaning and mopping of floors, staircases, walls,
roofs, windows, doors in the Office rooms and removal of
cob-web, waste materials, garbage etc, inside the plant and Admn.
Building. (Approx. total area covered per year 40,79,720 Sq.Mtr.)
in various sections for maintenance of good house keeping on
day-to-day basis for the period of one year from the date of
issue of Work order. |
|
26.11.2012 |
22.11.2012 to 05.12.2012 |
11.12.2012 15:00 hrs. |
HWPK/Mech/Winch/ 2012/11 Estimated Cost:
7,95,000/- |
Supply of Manual Winch and Jhula arrangement (02 Nos.) and
operating manpower in exchange unit for carrying out in service
inspection jobs at HWPK site. |
|
07.11.2012 |
08.11.2012 to 29.11.2012 |
11.12.2012 14:30 hrs. Date of Pre-bid clarification: 29.11.2012
10:00 hrs. to 04.12.2012 16:00 hrs. |
HWPK/Mech/2012/103 Estimated
Cost:
18,54,000/- |
Shot blasting of XU towers from inside near weld joints at HWPK
site during ATA-2013. |
|
14.11.2012 |
16.11.2012 to 30.11.2012 |
10.12.2012 14:30 hrs. date of Pre-bid clarification: 01.12.2012
10:00 hrs. to 06.12.2012 16:00 hrs. |
HWPK/MECH/2012/105 Estimated Cost:
89,00,000/- |
Replacement of Drain Header pipe line XU area at HWP (K) Site. |
|
02.11.2012
(26.11.2012 for Corrigendum-2) |
02.11.2012 to 23.11.2012 30.11.2012 |
03.12.2012 07.12.2012
14:30 hrs.
Pre Bid Meeting Date:
23.11.2012
30.11.2012 (10:00 hrs.) to 29.11.2012 04.12.2012
(16:00 hrs.) |
HWPK/Mech/2012/PV/101
Corrigendum in
Hindi
Corrigendum
in English
Corrigendum-2
Estimated Cost:
1,08,60,000/- |
Removal of existing vent header and fabrication & erection of
new vent header in Exchange Unit at HWP(Kota). |
|
23.10.2012 (26.11.2012 for Corrigendum) |
23.10.2012 to 20.11.2012 01.12.2012 |
24.11.2012 15:00 hrs.05.12.2012 14:30 hrs. |
HWPK/Mech-ISI/UT-ATA-2013/03 Estimated Cost:
41,00,000/-
Corrigendum to NIT |
Ultrasonic Flaw Detection (UFD) of weld joints and thickness
measurement / mapping at identified locations of XU towers /
vessels & piping at HWPK site during ATA-2013. |
|
05.11.2012 |
12.11.2012 to 27.11.2012 |
03.12.2012 15:00 hrs. |
HWPK/PROD/6/2012 Estimated Cost:
2,49,000/- |
Hydro-testing / Pneumatic testing / Hydro-pneumatic testing of
various process & utility loops during EMTA-2013. |
|
23.10.2012 |
29.10.2012 to 23.11.2012 |
03.12.2012 15:00 hrs. Pre Bid Meeting Date: 27.11.2012 |
HWP/K/CIVIL/P-9/16/2012 Estimated Cost:
34.43 Lakh |
Construction of Pre-Engineered Building for product storage at
Heavy Water Plant, Kota, Rajasthan. |
|
23.10.2012 |
05.11.2012 to 21.11.2012 |
26.11.2012 15:00 hrs. |
HWP(K)/ INST/ MANPOWER/ TEND/ 2012-13 Estimated Cost:
5,59,710/- |
Removal, shifting, cleaning and re-fixing of Transmitters along
with all accessories at HWPK during MTA-2013. |
|
23.10.2012 |
05.11.2012 to 20.11.2012 |
26.11.2012 15:00 hrs.
|
HWP(K)/INST/T-12 Estimated Cost:
8,30,700/- |
Installation of remote seal DPTs, PTs & FTs in XU towers and
replacement of corroded JBs at HWPK site during MTA-2013. |
|
12.10.2012 |
11.10.2012 to 24.11.2012 |
26.11.2012 14:00 hrs. |
HWP/TAL/2012/66 |
Sale of 2-ethyl Hexyl Chloride + 2 Ethyl Hexanol mixture on
as-is-where-is basis. |
|
09.10.2012 |
05.10.2012 to 31.10.2012 14.11.2012
22.11.2012Sale of
tender is extended upto 22.11.2012 |
02.11.2012
15.11.2012 23.11.2012 14:00 hrs. |
HWPM/DGMES/TSM/SALE/ASH/ 2012/01
Corrigendum to NIT |
Sale of Dry Fly Ash on as-is-where-is basis from HWP(M). |
|
29.10.2012 |
02.11.2012 to 17.11.2012 |
21.11.2012 15:00 hrs. |
HWP(K)/INST/WTP/TEND/2012-13 Estimated Cost:
2,09,340/- |
Servicing and Maintenance of Saunder's Valves & Actuators of
Water Treatment Plant at HWPK during Major Turn Around - 2013. |
|
07.11.2012 |
05.11.2012 to 17.11.2012 |
20.11.2012 15:00 hrs. |
HWP(K)/CIVIL/P-8/13/2012
Estimated Cost:
8,71,900/- |
Fixing concertina coil for plant boundary & repair works. |
|
17.10.2012 |
29.10.2012 to 16.11.2012 |
20.11.2012 15:00 hrs. |
HWPK/PROD/4/2012 Estimated Cost:
2,06,600/- |
Chemical cleaning of cooling water and chilled water heat
exchangers in XU. |
|
04.10.2012 |
08.10.2012 to 22.10.2012 06.11.2012
Sale of
tender is extended upto 06.11.2012 |
23.10.2012
15.11.2012 14:30 hrs. |
HWP(K)/I&C/FA/TEND/2012/01
Corrigendum to
NIT in Hindi
Corrigendum
to NIT in English
Estimated Cost:
6,82,000/- |
Supply, Installation, Testing, Commissioning, Guarantee,
Integration with existing Notifier 3030 Control Panel and
Programming of Fire Detection and Alarm System compatible with
Notifier 3030 for RAHIE and VFD at HWPK Site. |
|
19.10.2012 |
20.10.2012 to 06.11.2012 |
09.11.2012 15:00 hrs. |
HWPK/Electrical Maint./Aux_Power Estimated Cost:
24,46,700/- |
Supply & Installation of Auxiliary Power Distribution Boards and
Lighting Panels at HWP-K. |
|
26.09.2012 |
22.10.2012 to 02.11.2012 |
08.11.2012
14:00 hrs. |
1. HWPM/M-P/MISC/23/2012 Estimated Cost:
7,94,000/- |
Insulation works in Main Plant of HWP(M) (Hot insulation). |
|
2. HWPM/M-P/STEQP/25/2012
Estimated Cost:
6,86,000/- |
Re-tubing of Heat Exchanger Tube Bundles at HWP(M). |
|
17.09.2012 |
20.09.2012 to 30.10.2012 15.10.2012Sale of
tender is extended upto 30.10.2012 |
19.10.2012
02.11.2012 07.11.2012 15:00 hrs.Pre Bid Meeting
Date: 31.10.2012 14:30 hrs. |
HWP(K)/Mech/CT/2012
Corrigendum for NIT
Estimated Cost:
128,81,000/- |
Supply, Removal & Erection of structural members, eliminators
with associated parts, louvers and other components of cooling
tower during MTA 2013 at HWPK Site. |
|
09.10.2012 |
05.11.2012 |
06.11.2012 14:00 hrs. |
HWPM/MU/2012/BG/166/50001 Estimated Cost:
16,00,000/- |
Fabrication of secondary super heater coils for one boiler. |
|
16.10.2012 |
18.10.2012 to 02.11.2012 |
05.11.2012 15:00 hrs. |
HWP(K)/ELECT/MTA-13/TF_MAINT Estimated Cost:
14,40,900/- |
Maintenance of transformers and oil filtration at HWPK during
MTA-2013. |
|
03.10.2012 |
10.10.2012 to 30.10.2012 |
03.11.2012 15:00 hrs. |
HWP(K)/Mech/Liq N2/2012/07 Estimated Cost:
17,10,000/- |
Development of Fabrication / Machining drawings based on used
components, complete fabrication of rotor assembly including
impeller and bearings, inspection and testing, supply,
installation and commissioning of Liquid N2 Turbine rotor
assembly at Heavy Water Plant, Kota. |
|
21.09.2012 |
27.09.2012 to 17.10.2012 |
02.11.2012 15:00 hrs.
Pre Bid Meeting Date: 26.10.2012 14:00 hrs. |
HWPK/ELECT/MTA-2013/VCB Estimated Cost:
13,950,000/- |
Retrofitting of 6.6 KV LOCBs with Vacuum Circuit Breakers at
HWPK. |
|
28.09.2012 |
08.10.2012 to 29.10.2012 |
01.11.2012 14:30 hrs. |
HWP(K)/Mech/ATA-12/02 Estimated Cost:
26,95,000/- |
Supplying Manpower for Material handling, cleaning of components
and allied jobs, Handling, Shifting & repairing of components of
tower trays & preparation and removal of scaffoldings during
EATA-13 at HWPK Site. |
|
25.09.2012 |
26.09.2012 to 23.10.2012 |
30.10.2012 15:00 hrs. |
HWPK/Mech-ISI/MNDT-ATA-2013/04 Estimated Cost: 12,00,000/- |
Liquid Penetrant Testing, Wet Fluorescent Magnetic Particle
Testing of weld joints and metallography examination at
identified locations of XU Towers / Vessels at HWPK Site during
ATA-2013 |
|
21.09.2012 |
03.10.2012 to 29.10.2012 |
31.10.2012 15:00 hrs. |
HWPK/ELECT/MTA/2013/Relay/01 Estimated Cost:
10,72,692/- |
Maintenance, Testing and Calibration of Protective and Auxiliary
Relays at HWP(K). |
|
11.09.2012 |
17.09.2012 to 18.10.2012 |
29.10.2012 15:00 hrs. Pre
Bid Conference Date: 22.10.2012 |
HWB/ITLTP/01 Estimated Cost:
3.5 Crore |
System Study, Development, Testing,
Deployment, Training, Hand Holding and Support for ERP Software
called IIS (Integrated Information System) along with suitable
Servers in redundant mode for high availability for Heavy Water
Board and it's associated Heavy Water Plants at various
locations. IIS comprises on-line activities pertaining to HR,
Finance & Accounts, Maintenance Management, Stores & Inventory,
Plant Safety Work Permit System etc. IIS is expected to have 800
Tables, 1200 Forms & 1500 Reports. |
|
28.09.2012 |
01.10.2012 to 20.10.2012 |
22.10.2012 15:00 hrs. |
HWP(K)/ELECT/MTA-13/ACB Estimated Cost: 4,12,000/- |
Servicing of 415 volt Air Circuit Breakers of LT Switch Gear at
HWP(K). |
|
17.09.2012 |
01.10.2012 to 17.10.2012 |
19.10.2012 14:00 hrs. |
HWPM/CIVIL/MP-9/2012/29 Estimated Cost:
26 Lakhs |
Repairs in Works Building & Canteen -II at HWPM. |
|
17.09.2012 |
01.10.2012 to 17.10.2012 |
19.10.2012 14:00 hrs. |
HWPM/CIVIL/MP-17/2012/28 Estimated Cost:
5.40 Lakhs |
Replacement of roofing in EBP, Non AC sheet Cladding &
Miscellaneous works in BCP at HWPM. |
|
11.09.2012 |
01.10.2012 to 17.10.2012 |
19.10.2012 14:00 hrs. |
HWPM/CIVIL/MP-9/2012/17 (2nd
Call) Estimated Cost:
13.50 Lakhs |
House keeping of buildings and industrial areas of main plant
during the year 2012-13 & 2013-14 at HWP, Manuguru. |
|
01.10.2012 |
03.10.2012 to 16.10.2012 |
18.10.2012 15:00 hrs. |
HWP(K)/I&C/CAMC-FM/2012/01 Estimated Cost:
11,20,000/- |
Comprehensive Annual Maintenance Contract with Facility
Management (CAMC-FM) for IT Infrastructure at HWPK. |
|
12.09.2012 |
08.10.2012 |
09.10.2012 14:00 hrs. |
HWPM/MU/2012/BG/165/50001 Estimated Cost:
10,40,000/- |
Annual Overhauling of Rotating Equipments Dampers, Wind Box and
Coal Feeders of all 3 Boilers. |
|
03.09.2012 |
04.09.2012 to
27.09.2012 |
04.10.2012 15:00 hrs. |
HWPK/Mech/HEWAC-H2 Comp/2012-04
Estimated Cost:
2,02,500/- |
Re-babbiting of main bearings of H2 compressor of HEWAC and
subsequent machining to get required dimensions at HWPK Site. |
|
11.09.2012 |
10.09.2012 to
27.09.2012 |
28.09.2012 14:00 hrs. |
HWPM/COLONY/CIVIL/2012/14
Estimated Cost:
18.60 Lakhs |
Repairs to Recreation Centre and Renewing of approaches in HWPM
Colony. |
|
07.09.2012 |
10.09.2012 to
24.09.2012 |
27.09.2012 14:00 hrs. |
HWPM/M-P/RL/29/2012 Estimated
Cost:
7.80 Lakhs |
Re-rubber lining work at HWP(M) for MSRL pipes & spool pieces. |
|
07.09.2012 |
10.09.2012 to
24.09.2012 |
27.09.2012 14:00 hrs. |
HWPM/M-P/RL/26/2012 Estimated
Cost:
19.00 Lakhs |
Inspection of Rubber lining in MSRL vessels and Repair /
re-rubber lining of vessels at HWP (M). |
|
30.08.2012 |
31.08.2012 to
20.09.2012 |
24.09.2012 15:00 hrs. |
HWPK/Mech/Piping/LPG/2012
Estimated Cost:
7,33,500/- |
Fabrication, Welding, Erection & Insulation of pipelines for
laying of additional LPG piping from LPG Storage Tanks to LP &
HP flare stack in XU at HWPK Site. |
|
29.08.2012 |
04.09.2012 to
20.09.2012 |
21.09.2012 14:00 hrs. |
HWPM/COLONY/CIVIL/2012/12
Estimated Cost:
10.70 Lakhs |
Periodical Maintenance of roads and drains in HWP(M) Colony for
the year 2012-13. |
|
29.08.2012 |
28.08.2012 to
17.09.2012 |
21.09.2012 15:00 hrs. |
HWP(K)/Mech/Piping/2012/01
Estimated Cost:
60,00,000/- |
Removal & re-routing of 32" & 26" NB cooling water return header
of cooling tower at ground floor, Fabrication, Welding &
Erection of 32" & 26" NB Dia cooling water header along with 12"
NB branches for laying return header on RCC pedestals and pipe
support structural work at HWPK Site. |
|
07.09.2012 |
10.09.2012 to
18.09.2012 |
20.09.2012 15:00 hrs. |
HWPK/CIVIL/COLONY/C-08/09/2012
Estimated Cost:
12,53,000/- |
Raising of Compound Wall from Gate No.:03 (Manav Mandir) to STP
Colony Area. |
|
23.08.2012 |
10.09.2012 to
12.09.2012 |
18.09.2012 14:30 hrs. |
HWP/TAL/CIVIL/2012/21 Estimated
Cost:
11.90 Lakhs |
Annual Conservancy Work of HWP, Talcher Housing Colony for the
Year 2012-13. |
|
03.08.2012 |
09.08.2012 to
30.08.2012 |
17.09.2012 15:00 hrs. |
HWB/MSPP/HWP(TUT)/12-13/01
Estimated Cost:
1100.00 Lakhs |
Engineering, procurement, construction ( EPC work ) involving
process, mechanical, civil, electrical and instrumentation work,
complete project management and execution, consisting of plant
building, complete civil / structural works, supply and erection
of Multi Solvent Production Plant ( MSPP ) consisting of main
plant with associated equipment /systems along with certain
package utility units , auxiliary systems and associated
piping, electrical and instrumentation, erection of free issue
material and functional test run of all the supplied items under
scope of supply , at Heavy Water Plant, Tuticorin (Tamilnadu
). |
|
21.08.2012 |
04.09.2012 to
06.09.2012 |
15.09.2012 14:30 hrs. |
HWP:TAL:MAINT(E):2012:07
Estimated Cost:
4.12 Lakh |
Annual Electrical Maintenance at HWP, Talcher. |
|
10.08.2012 |
13.08.2012 to
06.09.2012 |
13.09.2012 15:00 hrs. |
HWPK/Mech-ISI/ECT-ATA-2013
Estimated Cost:
40,50,000/- |
Eddy Current Testing of shell and tube type of Heat Exchangers
tubes at HWPK Site during ATA-2013. |
|
10.08.2012 |
13.08.2012 to
04.09.2012 |
11.09.2012 14:30 hrs.
Date of Pre-bid meeting: 07.09.2012 |
HWPK/Mech/2012/EMTA-13/XUT
Estimated Cost:
2,57,40,000/- |
Removal, cleaning, inspection and reinstallation of sieve Trays
/ Internals of cold / hot exchange towers and waste strippers at
HWP (Kota). |
|
29.08.2012 |
19.08.2012 to
05.09.2012 |
10.09.2012 15:00 hrs. |
HWP(K)/CIVIL/P-8/15/2012
Estimated Cost:
6,13,000/- |
Filling the cable trench of Off Site H2S Monitors
with concrete around 2.20 Km from HWPK Plant Site. (III Phase) |
|
31.07.2012 |
07.08.2012 to
27.08.2012 |
10.09.2012 15:00 hrs. |
HWB/CIVIL/M/12/02 Estimated Cost:
290.00 Lakhs |
Civil & Structural Work for O18 Water Production Facility at
HWP(Manuguru). |
|
31.07.2012 |
06.08.2012 to
07.09.2012 |
10.09.2012 14:30 hrs. |
DPS/KRSU/29/PT-02/2012 |
Dismantling, Removal and Collection of existing Steam Generation
Plant (SGP) with its utility units on "AS IS WHERE IS BASIS" |
|
10.08.2012 |
31.08.2012 |
04.09.2012 14:30 hrs. |
HWPK/Mech/2012/SG-02 Estimated
Cost:
4,60,800/- |
Re-conditioning of used mechanical seal components. |
|
30.07.2012 |
20.08.2012 |
31.08.2012 15:00 hrs. Date of Pre-bid meeting:
26.08.2012 at 11:00 hrs. at HWP(K) Guest House. |
HWPK/ADMN/GH/02/2012 |
Purchase of two numbers of 03 BHK flats having carpet area of
approximately 1700 to 1800 sq ft. on ownership basis for using
as a Transit Guest House at Kota. Both the flats shall be
adjacent to each other on the same floor having common wall.
Location of the flats shall be within a distance of
approximately 01 km from Kota Railway Station in the proximity
of RAPS Guest & main road between Kota Railway Station & Kota
Town. |
|
19.07.2012 |
28.08.2012 |
31.08.2012 14:30 hrs. |
HWPK/Mech/2012/MTA-12/HE
Estimated Cost:
81,54,000 |
Maintenance & Testing of Heat Exchangers at
HWPK Site suring MTA-2012. |
|
18.07.2012 |
22.08.2012 |
24.08.2012 14:00 hrs. |
HWPM/CIVIL/MP-9/2012/26 Estimated
Cost:
19.50 Lakhs |
Repairs and Resurfacing of roads in Main
Plant at HWP, Manuguru-Phase-I. |
|
16.07.2012 |
16.08.2012 |
22.08.2012 14:30 hrs. |
HWPK/Mech/Piping/2012-03
Estimated Cost:
20,79,900/- |
Fabrication, welding & erection for
replacement of seal oil piping of H2S Gas Boosters
during MTA-12 at HWPK Site. |
|
16.07.2012 |
16.08.2012 |
21.08.2012 14:30 hrs. |
HWPK/Mech/Piping/2012-02
Estimated Cost:
17,19,000/- |
Fabrication, welding & erection of pipelines & fittings for
installation of new wafer type transmitters in Towers & other
misc. welding jobs during MTA-12 at HWPK Site. |
|
06.08.2012 |
14.08.2012 |
18.08.2012 15:00 hrs. |
HWP(K)/CIVIL/P-7/14/2012
Estimated Cost:
19,50,000/- |
Day to Day Maintenance of Industrial Open Area, Roads, Drains
etc. in HWP(K) at Anushakti for the year 2012-13. |
|
03.07.2012 |
16.08.2012 |
17.08.2012 14:00 hrs. |
HWPM/CIVIL/MP-9/2012/25 Estimated
Cost:
21,00,000/- |
Improvements to the toilets at HWPM. |
|
09.07.2012 |
08.08.2012 |
16.08.2012 14:00 hrs. |
HWPM/CIVIL/CPP-6/2012/23
Estimated Cost:
270.00 Lakhs |
Construction of boundary wall along Eastern
periphery and Repair/Replacement of existing fencing along
Southern & Western periphery of Green belt at HWP, Manuguru. |
|
26.07.2012 |
07.08.2012 |
08.08.2012 15:00 hrs. |
HWPK/Mech/HEWAC-N2Comp/2012-03
Estimated Cost:
5,35,000/- |
Re-Babbiting of main bearings of N2 compressor of HEWAC and
subsequent machining to get required dimensions. |
|
10.07.2012 |
04.08.2012 |
08.08.2012 14:00 hrs. |
HWPM/M-P/MISC/16/2012 Estimated
Cost:
5.05 Lakhs |
Removal of Existing Insulation & re fixing of hot insulation on
Bullets, Exchangers and connected pipelines etc. at Main Plant
of HWP(M). |
|
16.07.2012 |
06.08.2012 |
07.08.2012 14:00 hrs. |
HWPM/MU/2012/BG/153/50001/R1
Estimated Cost:
5,80,000/- |
Repair works of coal bunkers and assessing
the conditions of bunkers in CPP. |
|
11.06.2012 |
12.07.2012 |
06.08.2012 14:30 hrs. |
HWPK/INST/2012 Estimated Cost:
70,00,000/- |
Design, Supply, Installation, Testing, Commissioning and
Guarantee of Supervisory Control and Data Acquisition System
(SCADA) for H2S Monitoring System at HWPK Site. |
|
05.06.2012 |
20.07.2012 |
06.08.2012 15:00 hrs. Date of Pre-bid meeting:
25.07.2012 at 10:30 hrs. |
HWB/QA-12/HWP(Thal/Hazira)/12/02 Estimated Cost:
2,28,00000/- |
Design Adequacy Re-Evaluation work of Heavy Water Plant (Thal) &
Heavy Water Plant (Hazira). |
|
03.07.2012 |
16.07.2012Extended upto 24.07.2012 (16:00 hrs.) |
20.07.2012 14:30 hrs.
Extended upto 27.07.2012 14:30 hrs. |
HWPK/Mech/Piping/2012-05
Corrigendum for NIT
Estimated Cost:
17,12,759/- |
Annual Rate Contract for Fabrication,
Welding, Erection of Pipelines at HWP(K) Site. |
|
27.06.2012 |
24.07.2012 |
26.07.2012 14:00 hrs. |
HWPM/CIVIL/CPP-6/2012/22
Estimated Cost:
21.00 Lakhs |
Providing & Laying WBM road in Section - 6 (Balance Portion)
along the aerial ropeway at HWP, Manuguru, Khammam Dist. A.P. |
|
29.06.2012 |
24.07.2012 |
26.07.2012 14:00 hrs. |
HWPM/CIVIL/MP-5/2012/24 Estimated
Cost:
21.00 Lakhs |
Fly ash concrete pavement below pipe racks and painting to the
RCC structures at HWPM Phase-I. |
|
28.06.2012 |
23.07.2012 |
24.07.2012 14:00 hrs. |
HWPM/MU/2012/BG/164/50001
Estimated Cost: 12,98,000/- |
Annual Running Maintenance of Coal mills, Coal feeders, Fans,
Burner front etc. |
|
28.06.2012 |
23.07.2012 |
24.07.2012 14:00 hrs. |
HWPM/MU/2012/BG/162/50001
Estimated Cost: 5,40,000/- |
Running Maintenance of Ash handling
equipments, ESP, APH clinker grinder, BAH etc. |
|
02.07.2012 |
19.07.2012 |
23.07.2012 14:30 hrs. |
HWPK/Mech/FRP/2012-13 Estimated
Cost:
1,45,000/- |
Rate Contract for HDPE, PPE and FRP repair jobs on pipe spools,
flanges, nozzles & equipments etc. at HWP(K) Plant site for Two
years. |
|
18.06.2012 |
17.07.2012 |
21.07.2012 15:00 hrs. |
HWPK/I&C/PC-UPG/2012/01 Estimated
Cost: 8,92,800/- |
Up-gradation of Pentium-IV based Computers. |
|
02.07.2012 |
17.07.2012 |
20.07.2012 15:00 hrs. |
HWPK/HEWAC/1/2012 Estimated Cost:
7,38,310/- |
Shifting of adsorbents, oil, heavy water &
other chemicals drums (200 litre) and their charging to various
tanks / other vessels. |
|
25.06.2012 |
16.07.2012 |
19.07.2012 14:00 hrs. |
HWPM/CIVIL/MP-17/2012/9 (2nd Call)
Estimated Cost:
9.60 Lakhs |
Construction of new shed to cover the product storage tanks No.
19 & 20 and to provided dyke installed in D2O Storage
Building - 4. |
|
28.05.2012 |
19.06.2012 Extended upto 10.07.2012 |
21.06.2012 14:30 hrs. Extended upto
13.07.2012 14:30 hrs. |
HWPK/Mech/DDValve/ATA-2012/01/B
Estimated Cost:
21,12,000/-
Corrigendum to NIT |
Maintenance and Testing of Large size DD
valves covering sizes ranging from 12" NB - 36" NB at HWP(K)
during MTA-2012 |
|
28.05.2012 |
19.06.2012 Extended upto 10.07.2012 |
21.06.2012 14:30 hrs. Extended upto
13.07.2012 14:30 hrs. |
HWPK/Mech/DDValve/ATA-2012/01/A Estimated Cost:
23,82,000/-
Corrigendum to NIT |
Maintenance and Testing of Small Size DD
Valves sizes ranging from 2" NB - 10" NB at HWP(K) during
MTA-2012. |
|
29.06.2012 |
06.07.2012 |
10.07.2012 15:00 hrs. |
HWP(K)/CIVIL/P-8/12/2012
Estimated Cost: 17,78,000/- |
Replacement of A.C. Roof Sheets with
Galvalume Sheets in Central Stores at HWPK Site - 2012-2013. |
|
29.06.2012 |
06.07.2012 |
10.07.2012 15:00 hrs. |
HWP(K)/CIVIL/P-8/13/2012
Estimated Cost: 12,62,000/- |
Renovation of Toilets at HWPK Site. |
|
26.06.2012 |
02.07.2012 |
05.07.2012 15:00 hrs. |
HWP(K)/CIVIL/P-06/10/2012
Estimated Cost: 16,90,000/- |
Annual Maintenance of lawns and gardens at
HWPK Anushakti for the year 2012-13. |
|
11.06.2012 |
03.07.2012 |
05.07.2012 14:00 hrs. |
HWPM/CIVIL/MP-17/2012/18
Estimated Cost: 21,00,000/- |
Chain link fencing to boron plants in HWPM. |
|
21.05.2012 |
03.07.2012 |
05.07.2012 14:00 hrs. |
HWPM/CIVIL/CPP-6/2012/16 Estimated Cost:
9.29 Lakhs |
Construction of Additional watch towers at
Heavy Water Plant, Manuguru, Khammam Dist. A.P. |
|
10.05.2012 |
04.06.2012 |
02.07.2012 15:00 hrs.
Pre-Bid Conference: 14.06.2012 |
HWB/PE/O18/EPC-01 Estimated Cost: 4.8
crore |
Engineering, Procurement, Construction (EPC) involving process
and mechanical work, complete project management and execution
consisting designing, fabrication, supply and erection,
integration of water distillation cascade with associated
systems / equipments, utility facilities along with associated
piping and tubing and erection of free issue materials etc.,
commissioning and performance testing at Heavy Water Plant,
Manuguru (A.P) |
|
18.06.2012 |
25.06.2012 |
28.06.2012 15:00 hrs. |
HWPK/ADMN/TC/01/2012 Estimated
Cost: 71,10,000/- |
Supply and plying of two buses of 2010 or later model having
seating capacity of 52 persons on hire basis for transportation
of HWP(K) Employees from HWP(K) Housing Colony to Site Office /
Kota & back for a period of two years from 01.08.2012 to
31.07.2014. |
|
23.05.2012 |
23.06.2012 |
28.06.2012 14:00 hrs. |
HWPM/CIVIL/MP-5/2012/13
Estimated Cost:
15,00,000 /- |
Painting works for chemical lab, works
building,CCR and other industrial buildings at main plant of
HWPM. |
|
13.06.2012 |
19.06.2012 |
23.06.2012 |
HWP(K)/CIVIL/COLONY/C-02/05/2012 Estimated Cost:
20,50,000/- |
Upkeeping & Miscellaneous works in HWP(K)
Housing Colony for the year 2012-2013. |
|
13.06.2012 |
19.06.2012 |
23.06.2012 15:00 hrs. |
HWP(K)/COLONY/C-05/06/2012
Estimated Cost: 20,50,000/- |
Carpentry, Plumbing, Masonry, Welding & Stores handling jobs at
HWP(K) Housing Colony at Rawatbhata during the year 2012-13. |
|
13.06.2012 |
19.06.2012 15:00 hrs. |
23.06.2012 15:00 hrs. |
HWP(K)/CIVIL/COLONY/C-1/03/2012 Estimated Cost:
5,38,000/- |
Widening of road networks in HWP(K) Housing Colony during the
year 2012. |
|
22.05.2012 |
20.06.2012 |
23.06.2012 14:30 hrs. |
HWPK/Mech/DDValve/ATA-2012/02
Estimated Cost:
22,05,000 /- |
Removal, shifting, re-installation of valves
and maintenance of flange joints at HWPK during MTA-2012 at
Heavy Water Plant(Kota), Anushakti - 323 303. |
|
21.05.2012 |
16.06.2012 |
22.06.2012 14:00 hrs. |
HWPM/CIVIL/MP-9/2012/17
Estimated Cost:
13.50 Lakhs |
House keeping of buildings and industrial areas of main plant
during the year 2012-12 & 2013-14 at HWP, Manuguru. |
|
31.05.2012 |
15.06.2012 |
19.06.2012 15:00 hrs. |
HWP(K)/CIVIL/P-3/06/2012-IIIrd call
Estimated Cost:
10,35,000/- |
Flooring in Administrative building HWP (K) Anushakti. |
|
21.05.2012 |
05.06.2012 |
19.06.2012 15:00 hrs.
Date of Pre-bid meeting: 12.06.2012 at 15:00 hrs. |
HWB/R&D/ERCA/ERECTION/02/12 Estimated Cost:
50 Lakhs |
Erection of ERCA Unit Equipments, including
procurement & supply of PP/HDPE pipe & pipe fittings, PP Ball
valves, fabrication and erection of HDPE pipes along with MS
Pipe racks, supports etc. |
|
31.05.2012 |
11.06.2012 |
15.06.2012 15:00 hrs. |
HWP(K)/CIVIL/P-8/11/2012
Estimated Cost:
7,50,000/- |
Epoxy painting of Sodium Sulphate Bulk Storage Tank in H2S Area
at HWP(K). |
|
26.04.2012 |
22.05.2012 |
31.05.2012 14:30 hrs.
Date of Pre-bid meeting: 25.05.2012 at 14:00 hrs. |
HWB/ITLTP/CAMCFM/AMC/2012/424
Estimated Cost: 14.5 Lakhs
|
Comprehensive Annual Maintenance Contract with Facility
Management (CAMC-FM) of IT Infrastructure available in Heavy
Water Board. |
|
10.05.2012 |
22.05.2012 |
23.05.2012 15:00 hrs. |
HWB/CE(E)/220/2012/01 Estimated Cost:
1.35 Lakhs |
Annual Comprehensive Maintenance and Servicing Contract of 114
Nos. of split window air-conditioners of different make
installed at V.S.Bhawan, Anushakti Nagar, Mumbai - 400
094. |
|
24.04.2012 |
15.05.2012 |
17.05.2012 14:00 hrs. |
HWPM/CIVIL/G-10/2012/15 Estimated Cost: 6.50
Lakhs |
Non Destructive Test and Residual Life Assessment of RCC
Structures (Industrial Structures) in Heavy Water Plant,
Manuguru, Khammam Dist. A.P. |
|
02.05.2012 |
05.05.2012 |
10.05.2012 15:00 hrs. |
HWP(K)/CIVIL/P-3/06/2012 Estimated Cost: 10,35,000/- |
Flooring in Administrative Building at HWPK Anushakti. |
|
22.03.2012 |
24.04.2012 |
10.05.2012 15:00 hrs.
Date of Pre-bid meeting: 27.04.2012 at 11:00 hrs. |
HWB/BKJ/2012/SOLAR/HWPM/RFP-PHASE1
Estimated Cost of Projects on which consultancy is required: 100
Crore
Estimated Cost of Consultancy Work:
7.47 Lakh |
Engineering services for preparation of DPR, cost estimates etc.
for establishment of solar PV power plant at HWP (M), (A.P.). |
|
16.04.2012 |
25.04.2012 |
28.04.2012 15:00 hrs. |
HWP(K)/CIVIL/P-7/08/2012 Estimated Cost:
18,59,000/- |
Day-to-Day Maintenance of Plant Buildings at
HWP(K) Plant Site for the year 2012-13. |
|
09.04.2012 |
25.04.2012 |
26.04.2012 14:00 hrs. |
01. HWPM/COL/CIVIL/2012/05 Estimated Cost:
10,41,000/-
02.
HWPM/COL/CIVIL/2012/06
Estimated Cost: 15,25,000/- |
01. Replacement of WC Pans, Wash Basins, Kitchen Sink and other
Miscellaneous works at HWP(M) Colony. 02. Replacement of
damaged door/window/ventilator shutters in HWPM Colony for the
year 2012-2013. |
|
27.03.2012 |
23.04.2012 |
26.04.2012 14:00 hrs. |
HWPM/CIVIL/MP-17/2012/9 Estimated Cost:
9.60 Lakhs |
Construction of new shed to cover the product storage tanks No.
19 & 20 and to provide dyke installed in D20 storage
building-4. |
|
19.03.2012 |
13.04.2012 |
19.04.2012 14:00 hrs. |
HWPM/CIVIL/MP-12/2012/6 Estimated Cost:
6,60,000/- |
Grass cutting along the roads and operational
areas of main plant, HWPM - 2012-13. |
|
26.03.2012 |
04.04.2012 |
09.04.2012 15:00 hrs. |
HWP(K)/CIVIL/COLONY/C-06/02/2012 Estimated Cost:
21,57,000/- |
Annual Maintenance of lawns & gardens & planting of trees in
HWP(K) Housing Colony for the year 2012-2013. |
|
15.03.2012 |
31.03.2012 |
03.04.2012 15:00 hrs. |
HWPK/MECH-HEWAC/N2-Comp/2012-01 Estimated Cost:
6,80,000/- |
Repair / balancing of crank shaft of N2 compressor and re-babbiting
of bearing. |
|
09.03.2012 |
30.03.2012 |
03.04.2012 15:00 hrs. |
HWPK/Mech/RL/2012-13 Estimated Cost:
8,00,000/- |
Re-Rubber lining of acid storage tanks and
Rate contract for Rubber Lining work on already-fabricated
Piping spools equipments and Nozzles at HWP(K) for Two Years. |
|
20.02.2012 |
16.03.2012 |
21.03.2012 14:00 hrs. |
HWP(M)/E-P/D2O-5/LTG/NIT/2012/26
|
Electrification of D2O Storage Building-5. |
|
02.02.2012 |
14.03.2012 |
21.03.2012 14:30 hrs. |
HWP/TAL/INST/2012/01 Estimated Cost:
25.49 Lakhs |
Installation, Configuration, Testing and Commissioning of
Servers and Wide Area Networking system including supply of
Servers, Software and Accessories. |
|
13.02.2012 |
13.03.2012 |
16.03.2012 15:00 hrs. |
HWPK/PROD/DISPOSAL/1-A/2011 |
"Sale
of Sodium Sulphate (Glauber Salt), ON AS IS WHERE IS BASIS,
APPROXIMATE QUANTITY - 600 MT" at Heavy Water Plant
(Kota). |
|
24.02.2012 |
13.03.2012 |
16.03.2012 14:30 hrs. |
HWPK/Mech/2012/SG-01 Estimated Cost:
10,15,560/- |
Annual Rate Contract for Maintenance of Pumps
& Flange Joints, Valve Replacements etc. at HWPK Site. |
|
27.02.2012 |
09.03.2012 |
12.03.2012 15:00 hrs. |
HWPK/Mech-ISI/2012-01 Estimated Cost:
2,90,000/- |
Handling of sophisticated ISI Equipments and preparation of jobs
in field at HWPK Site. |
|
01.03.2012 |
03.03.2012 |
07.03.2012 15:00 hrs. |
HWP(K)/CIVIL/P-8/05/2012
Estimated Cost:
5,31,000/- |
Repair of Retaining wall near switch yard and yard number 09 at
HWPK Site. |
|
01.03.2012 |
03.03.2012 |
07.03.2012 15:00 hrs. |
HWP(K)/CIVIL/P-5/01-A/2012
Estimated Cost:
8,38,000/- |
Flooring and Painting in Administrative Building at HWPK
Anushakti. |
|
01.03.2012 |
03.03.2012 |
07.03.2012 15:00 hrs. |
HWP(K)/CIVIL/P-5/01/2012
Estimated Cost:
19,90,000/- |
Asphalting of Road at HWP (Kota) in the year
2012. |
|
01.03.2012 |
03.03.2012 |
07.03.2012 15:00 hrs. |
HWP(K)/CIVIL/COLONY/C-08/01/2012
Estimated Cost:
16,54,000/- |
Roof truss & sheeting work for "Vansthali" at HWPK Housing
Colony, Rawatbhata. |
|
23.01.2012 |
28.02.2012 |
01.03.2012 14:00 hrs. |
HWPM/CIVIL/HYD/G-30/2012/2 Estimated Cost:
8.50 Lakhs |
Parking sheds for scooter and cars in facilities to HWPM at
Hyderabad. |
|
13.02.2012 |
23.02.2012 |
27.02.2012 14:30 hrs. |
HWPK/Mech/Stru/2011-06 Estimated Cost:
19,43,292/- |
Supply & Fabrication, Welding, Erection of
Miscellaneous Structures at HWP(K) Site. |
|
25.01.2012 |
13.02.2012 |
16.02.2012 14:00 hrs. |
HWPM/COL/CIVIL/2011/28 Estimated Cost:
14.79 Lakhs |
Repairs to Storm water drains in HWPM Colony. |
|
30.01.2012 |
14.02.2012 |
15.02.2012 14:00 hrs. |
HWPM/I-P/COMP/2012 Estimated Cost:
8,00,000/- |
Annual Maintenance Contract for Computers,
Printers & LAN. |
|
31.01.2012 |
09.02.2012 |
13.02.2012 14:30 hrs. |
HWP(K)/CIVIL/P-08/10/2011 Estimated Cost:
10,70,000/- |
Renovation of toilets at HWPK in year 2011-12. |
|
16.01.2012 |
07.02.2012 |
09.02.2012 14:00 hrs. |
HWPM/CIVIL/CPP-6/2012/1
Estimated Cost:
9.00 Lakhs |
Miscellaneous Civil Works (Masonry) in CPP at HWP, Manuguru. |
|
03.02.2012 |
06.02.2012 |
07.02.2012 14:00 hrs. |
HWPM/DGM(U)/MU/IC/50001/01/2012
Estimated Cost:
9,00,000/-
|
Structural Painting in ICHP. |
|
18.01.2012 |
31.01.2012 |
03.02.2012 14:30 hrs. |
HWPK/FIRE/2012/01
Estimated Cost:
6,00,000/- |
Replacement & Maintenance of Fire Pump and Allied Equipments. |
|
10.01.2012 |
29.01.2012 |
02.02.2012 14:30 hrs. |
HWPT/INST/232/2011/02 Estimated Cost:
75,004/- |
Comprehensive Annual Maintenance Contract for LG make, model
Aria-1000, Electronic Telephone Exchange of HWP (Tuticorin). |
|
16.01.2012 |
27.01.2012 |
30.01.2012 14:30 hrs. |
HWPK/Mech/2011/06 Estimated Cost:
66,600/- |
Servicing and Load Testing of Chain Pulley Blocks, Fork Lifts,
Jib Crane, E O T & Mobile Cranes at HWPK Site. |
|
31.10.2011 |
-- |
30.12.2011
(Extended - please see
amendment) |
Notice inviting
"Expression of Interest"
Last date for submission
extended upto 30th January 2012. |
For and on behalf of President of India,
Associate Director (R&D, S&SE), HWB, Department of Atomic Energy
(DAE), Government of India invites "Global Expression of
Interest (EoI)" from Agencies of International repute for
providing Global Sales Representative Service to the Department
of Atomic Energy, Government of India for export of Heavy Water
to various countries. |
|
06.01.2012 |
25.01.2012 |
27.01.2012 14:00 hrs. |
DPS/HWP/B/269/ST/6370 |
Disposal of scrap items of different group. |
|
23.12.2011 |
10.01.2012 |
18.01.2012 15:00 hrs
Date of Pre-Bid meeting: 12.01.2012 |
HWB/TDP/ERCA/E&I/11/01 Estimated Cost:
50 Lakh |
Supply, Erection and Commissioning of Electrical and
Instrumentation Items for ERCA set up at TDP, RCF, Chembur,
Mumbai. |
|
02.01.2012 |
13.01.2012 |
17.01.2012 14:30 hrs. |
HWP(K)/CIVIL/P-03/21/2011 Estimated Cost:
10,73,000/- |
Water proofing of roof terraces with polymer based water
proofing treatment for Plant Buildings at Heavy Water Plant
(Kota) Anushakti for the year 2011-12. |
|
08.12.2011 |
13.01.2012 |
17.01.2012 15:00 hrs. |
HWPK/PROD/DISPOSAL/1/2011 |
SALE OF SODIUM SULPHATE (GLAUBER SALT), ON AS IS WHERE IS BASIS,
APPROXIMATE QUANTITY - 600 MT". |
|
27.12.2011 |
09.01.2012 |
12.01.2012 15:00 hrs. |
HWPK/Mech-ISI/2011-01 Estimated Cost:
2,26,000/- |
Shot blasting of H2S storage tank nos. 3814TK-8/9/10/11 for
surface cleaning from inside of the tanks. |
|
14.12.2011 |
31.12.2011 |
05.01.2012 14:30 hrs. |
HWP/CIVIL/COLONY/13/2011 Estimated Cost:
7,08,800/- |
House keeping of the vacant areas and
staircase areas of residential blocks at HWP(T) colony for the
year 2012-13. |
|
12.12.2011 |
31.12.2011 |
04.01.2012 15:00 hrs. |
HWPK/Mech/Vwire-Screen/2011 Estimated Cost:
5,40,000/- |
Fabrication, testing and supply of SS 304 Vee Wire Screen
Element with flange for the 12" NB Rubber Lined Resin Trap in
the outlet of Cation and Anion beds of Water Treatment Plant. |
|
07.12.2011 |
03.01.2012 |
04.01.2012 14:00 hrs. |
HWPM/I-P/COMP/2011/655
Estimated Cost:
8,00,000/- |
Annual Maintenance Contract for Computers, Printers & LAN. |
|
16.12.2011 |
28.12.2011 |
02.01.2012 14:30 hrs. |
HWPK/MECH/05 Estimated Cost:
2,10,600/- |
Maintenance & Testing of Safety Relief Valves at HWPK Site. |
|
14.12.2011 |
24.12.2011 |
27.12.2011 15:00 hrs. |
HWPK/INST/2011 Estimated Cost:
1,00,000/- |
Comprehensive Annual
Maintenance Contract for Tata make Telephone Exchange Model
IDX-1250 with built in capacity of 450 lines including tie
lines. |
|
05.12.2011 |
20.12.2011 |
26.12.2011 15:00 hrs. |
HWPK/PROD/5/2011 Estimated Cost:
3,60,740/- |
Operation and Routine Maintenance of Sewage Treatment Plant and
Cleaning / Parking of Solar Discs of Solar Steam Generation
Plant. |
|
02.11.2011 |
05.12.2011
Extended upto
20.12.2011 |
09.12.2011 14:30 hrs.
Extended upto
24.12.2011 14:30hrs. |
HWPK/TSS/2011/01 Estimated Cost:
74,826/- Click to see
Corrigendum: HWPK/TSS/2011/01/543 |
Witnessing the Statutory Testing of Safety
Relief Valves and Storage Tanks as per SMPV (U) Rule-18 & 19 at
HWPK Site. |
|
07.12.2011 |
19.12.2011 |
20.12.2011 14:30 hrs. |
HWP/B/21/11-12/TS-136/ETP Estimated Cost:
3,61,000/- |
CPVC Piping Work for Effluent Treatment Plant (ETP). |
|
21.11.2011 |
13.12.2011 |
17.12.2011 15:00 hrs. |
HWPK/I&C/WCMS/2011/01 Estimated Cost:
8,25,000/- |
Supply, Implementation, Support, Maintenance and Training of
Works Contract Management System (WCMS) package based on CPWD
guidelines at HWP(K). |
|
08.11.2011 |
30.11.2011 |
05.12.2011 15:00 hrs. |
HWPK/PROD/4/2011 Estimated Cost:
16,16,200/- |
Operation work of Shifting of cylinders,
cooling tower cells cleaning, chemical dissolution & drums
handling, sodium sulphide dissolution, digging and shifting of
sodium sulphate (Glauber Salt) in tanks and Cleaning of
Neutralization Pit in WTP at Heavy Water Plant (Kota). |
|
02.11.2011 |
25.11.2011 |
05.12.2011 15:00 hrs. |
HWPK/CIVIL/P-9/17-2/2011 Estimated Cost:
30.00 Lakh |
Construction of Pre-Engineered Building for
product storage at Heavy Water Plant, Kota, Rajasthan. |
|
08.11.2011 |
Tender has been cancelled.
click to see corrigendum. |
HWPK/I&C/BI-WEB/2011/01 Estimated Cost:
1,10,000/- |
Development, Deployment and Documentation of Interactive
Bilingual Intranet Website at HWP(K). |
|
04.10.2011 |
02.11.2011 |
21.11.2011 14:30 hrs. |
HWPK/INST/2011 Estimated Cost:
90,00,000/- |
Design, Engineering, Estimation, Supply, Installation, Testing,
Commissioning and Guaranty of IP based CCTV System at HWPK Site. |
|
31.10.2011 |
14.11.2011 |
15.11.2011 14:30 hrs. |
DPS/KRSU/29/PT-02/2011 |
|
|
13.10.2011 |
04.11.2011 |
10.11.2011 14:30 hrs. |
HWP/TAL/MECH/2011/07 Estimated Cost:
8.00 Lakhs. |
Maintenance of Machines and Equipments in existing facilities
for Production of Solvents. |
|
18.10.2011 |
04.11.2011 |
08.11.2011 14:30 hrs. |
HWPK/MECH/SCAFF/2011-12 Estimated Cost:
16,93,500/- |
Annual Rate Contract for Preparation and Removal of Scaffoldings
and supply of Semi Skilled Manpower for the job of Material
Handling, Cleaning of Components etc. for day-to-day Maintenance at HWPK Site. |
|
11.10.2011 |
29.10.2011 |
03.11.2011 14:30 hrs. |
HWPK/Mech/Piping/2011-05 Estimated Cost:
12,31,200/- |
Supply of Structural Steel, Removal, Fabrication, Welding,
Erection and Replacement of Roof Plate, inside Roof Structure of
Sodium Sulphate bulk Storage Tank (3815 TK-15) at HWPK Site. |
|
13.10.2011 |
29.10.2011 |
02.11.2011 14:30 hrs. |
HWP(K)/Civil/P-09/17-1/2011 Estimated Cost:
51,90,000/- |
Civil and Structural works for Product Tank
Storage Building at HWP (Kota): Part-I |
|
30.09.2011 |
17.10.2011 |
20.10.2011 15:00 hrs. |
HWPK/Mech/Foot Valve/2011 Estimated Cost:
1,75,000/- |
Under Water job of Removal and Installation of 14" NB Flanged
End, 150# Foot Valves in filter water wet well at HWP(K). |
|
26.09.2011 |
03.10.2011 |
07.10.2011 15:00 hrs. |
HWP(K)/CIVIL/C-05/08/2011 Estimated Cost:
12,90,000/- |
Miscellaneous Civil Maintenance / Renovation
works at HWP (K) Housing Colony for the year 2011-12. |
|
12.09.2011 |
27.09.2011 |
01.10.2011 15:00 hrs. |
HWPK/ADMN/TC/22/2011
Part A:
Estimated Cost:
39,20,400/-
Part B:
Estimated Cost:
27,21,600/- |
Part A: Supply and plying of two numbers of Tata Sumo/ Mahindra Bolero/ Chevorlet
Tavera Vehicles (Seating Capacity 8+1) BS-IV compliant in show
room condition for a period of three years on contract basis.
Part B: Supply and plying of two numbers of Tata Indica Vista
Cars (Seating Capacity 4+1) BS-IV compliant in show room
condition for a period of three years on contract basis. |
|
08.09.2011 |
24.09.2011 |
30.09.2011 14:30 hrs. |
HWP/TAL/CIVIL/2011/16 Estimated Cost: 52.25
lakhs. |
Construction of Underground Water Reservoir of capacity 800 CUM
in the Housing Colony at HWP, Talcher. |
|
15.09.2011 |
24.09.2011 |
28.09.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/G |
01. HWPM/M-P/102/MTA-2011/08 - Piping fabrication & Erection
works in connection with various modification jobs during
MTA-2011. 02. HWPM/M-P/102/MTA-2011/27 - Ultrasonic Flaw
Detection (UFD) & Liquid Penetrant Test (LPT), Wet Fluorescent
Magnetic Particle Test of weld joints and Hardness Measurement
work during MTA-2011.
03. HWPM/E-P/MTA-11/TR/O-H/NIT/2011 - Overhauling of Power
Transformers (03 Nos.) & Distribution Transformers (10 Nos.)
work during MTA-2011 at HWP (M). |
|
26.08.2011 |
13.09.2011 |
16.09.2011 16:00 hrs. |
|
Appointment of Licensees for the
Implementation of Ammonia Flue Gas Conditioning System, developed
and patented by Heavy Water Board. |
|
23.08.2011 |
13.09.2011 |
17.09.2011 14:30 hrs. |
HWPK/Mech/2011/04 Estimated Cost: 22,41,000/- |
Annual rate contract for repair & maintenance
of insulation work on Towers, Tanks, Exchangers and Piping etc.
at HWP (K) Site. |
|
25.07.2011 |
13.09.2011 |
16.09.2011 14:30 hrs. |
HWPK/Mech-Valve/2011-01 Estimated Cost: 14,53,500/- |
Maintenance & Testing
of double discs & wedge type gate valves & utility valves at HWP(K)
Site. |
|
24.08.2011 |
09.09.2011 |
14.09.2011 14:30 hrs. |
HWPK/I&C/PCAMC/2011/01 Estimated Cost: 6,28,000/- |
Annual Maintenance Contract for Servicing /
Maintenance of Computer System Alongwith Peripherals Installed
at HWP (K). |
|
19.08.2011 |
27.08.2011 |
30.08.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/D-2 |
01. Complete overhauling including seal
inspection, suction & discharge spools replacement work of H2S
gas boosters during MTA-2011 at HWP(M). 02.
Maintenance & Testing of DD/Gate/Check Valves of sizes from 16"NB to
36"NB during MTA-2011 at HWP(M). |
|
19.08.2011 |
27.08.2011 |
30.08.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/D-1 |
01. Flange joints maintenance during MTA-2011
at HWP(M). 02. Servicing and testing of Safety
Valves during MTA-2011 at HWP(M). 03.
Servicing and testing of Plug Valves during MTA-2011 at HWP(M).
04. Eddy Current Testing of Shell & Tube type Heat Exchangers
during MTA-2011 at HWP(M). 05. Overhauling of
6.6 KV and 33 KV MOCB's at HWP(M). 06. SDV
Actuator maintenance during MTA-2011. 07.
Maintenance of Control Valves during MTA-2011. |
|
05.08.2011 |
01.09.2011 |
07.09.2011 14:30 hrs. |
HWP/TAL/CIVIL/2011/14 Estimated Cost: 14.92
Lakhs |
External Painting of
Plant and Office Buildings at Heavy Water Plant, Talcher. |
|
25.07.2011 |
27.08.2011 |
30.08.2011 14:30 hrs. |
HWPK/Mech/Piping/2011-03 Estimated Cost: 13,96,440/- |
Fabrication, Welding &
Erection of Pipe Lines at HWP(K). |
|
18.08.2011 |
26.08.2011 |
29.08.2011 14:30 hrs. |
HWP(K)/CIVIL/P-08/10/2011 Estimated Cost: 10,70,000/- |
Renovation of toilets
at HWPK in year 2011. |
|
04.08.2011 |
24.08.2011 |
27.08.2011 15:00 hrs |
HWPK/ELECT/FB/2011 Estimated Cost: 2,35,224/- |
Repair / replacement
of fire barriers installed at cables entry in different substations
/ buildings of HWPK Site. |
|
21.07.2011 |
13.08.2011 |
18.08.2011 14:00 hrs. |
HWPT/MECH/649 Estimated Cost: 13,02,200/- |
Supply, erection and
commissioning of mechanical packages for Effluent Treatment Plant
for Versatile Solvent Synthesis Pilot Plant. |
|
02.08.2011 |
06.08.2011 |
12.08.2011 14:30 hrs. |
HWP:TAL:MAINT(E):2011:09 |
Jointing of 11 kV 150
sq.mm. unearthed XLPE cable laid for Colony Power Supply. |
|
04.07.2011 |
22.07.2011 |
12.08.2011 15:00 hrs. |
HWB/PE/O-18/P-I/01
Estimated Cost: 570 Lakh |
Engineering,
procurement, construction (EPC) involving process, mechanical,
civil, electrical and instrumentation work, complete project
management and execution, consisting of plant building, complete
civil / structural works, supply and erection of O18 water
production facility consisting of integration of water distillation
cascade with associated systems / equipments, utility facilities
along with associated piping, electrical and instrumentation,
auxiliary systems, erection of free issue material, commissioning
and performance testing of the complete plant at Heavy Water Plant,
Manuguru (AP). |
|
15.07.2011 |
27.07.2011 |
03.08.2011 14:00 hrs. |
HWPM/DGMP/M-P/30001/CT/15/2011 Estimated Cost: 59.34 Lakhs |
Complete revamping of
Cooling Tower Cells (2 Nos.) at Heavy Water Plant (Manuguru). |
|
08.07.2011 |
27.07.2011 |
03.08.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/C |
01. Re-routing &
Laying of CW return
header on Ground floor for Main Cooling Tower at Main Plant of
HWP (M). 02. Gate Valve / Globe Valve / Non-return Valve
/ Butterfly Valve dropping & re-erection during MTA-2011 in Main
Plant of HWP (M).
03. Removal Existing damaged hot insulation,
fixing of hot insulation on piping, vessels and Heat Exchanger
including painting in Main Plant of HWP (M) during MTA-2011. |
|
04.07.2011 |
16.07.2011 |
27.07.2011 14:00 hrs. |
HWPM/M-P/MTA-2011/B |
Maintenance & Testing
of DD/Gate/Check Valves at HWP(Manuguru). |
|
15.07.2011 |
22.07.2011 |
26.07.2011 14:30 hrs. |
HWP(K)/CIVIL/P-08/12/2011 Estimated Cost: 11,60,000/- |
Epoxy and Chlorinated
Rubber Painting of Sodium Sulphate Solar Evaporation Tanks, VDS
(M.S.) and Epoxy Painting on Booster Foundation (R.C.C) in the year
2011-2012 at HWPK. |
|
14.07.2011 |
22.07.2011 |
26.07.2011 14:30 hrs. |
HWPK/Mech/Piping/2011/04 Estimated Cost: 1,41,531/- |
Cold insulation on
equipments for HEWAC facility at HWPK Site. |
| 24.06.2011 |
15.07.2011 |
25.07.2011 15:00 hrs. |
HWB/MECH/SA/ATA/2011
Estimated Cost: 2,75,000/- |
Salvaging of service aged Inconel 625 and
Stainless Steel cracker components by resolution annealing heat treatment and machining of
the same |
| 30.06.2011 |
19.07.2011 |
22.07.2011 14:30 hrs. |
HWPK/Mech/2011/03
Estimated Cost: 1,44,000/- |
Rectification of damaged components of sieve
tray of XU Towers at HWP(K) Site. |
| 27.06.2011 |
13.07.2011 |
16.07.2011 14:30 hrs. |
HWPK/Mech/OLS/2011
Estimated Cost: 1,67,000/- |
Annual rate contract for on line sealing
jobs of steam leakage at HWPK Site. |
| 01.07.2011 |
08.07.2011 |
11.07.2011 14:30 hrs. |
HWP(K)/CIVIL/P-7/14/2011
Estimated Cost: 15,50,000/- |
Day to Day Maintenance of Industrial Open
Area, Roads, Drains etc. in HWP(K) at Anushakti for the year 2011-12. |
| 01.06.2011 |
24.06.2011 |
06.07.2011 14:00 hrs. |
HWPM/M-P/102/MTA-2011/01
Estimated Cost: 63.00 Lakhs |
Heat Exchangers Maintenance and Testing work
during MTA-2011 in HWP(M). |
| 07.06.2011 |
22.06.2011 |
24.06.2011 14:30 hrs. |
HWPK/Mech/DDdisc/2011
Estimated Cost: 14,81,000/-
|
Repair of discs of
double disc gate valves of HWP, Kota. |
| 29.04.2011 |
06.06.2011 |
20.06.2011 15:00 hrs |
HWB/MECH/SA/2011
|
Salvaging of
service aged Inconel 625 and stainless steel cracker
components by resolution annealing heat treatment and
involving other manufacturing & fabrication activities. |
| 09.05.2011 |
26.05.2011 16:00 hrs. |
17.06.2011 15:00 hrs. |
HWB/UOF/K/02 Estimated
Cost: 22 Crores. |
Engineering,
procurement, construction (EPC) of Denitration plant consisting
of Denitration columns, pre-heaters, cyclone separators, scrubbers, induction heaters,
evaporators, condensers various vessels, pumps along with the associated piping,
electrical and instrumentation, commissioning and performance testing at Kalpakkam, Tamil
Nadu. |
| 27.05.2011 |
10.06.2011 |
14.06.2011 14:30 hrs. |
HWP(K)/CIVIL/C-05/04/2011
Estimated Cost: 21,00,000/-
|
Carpentry, Plumbing,
Masonry, Welding & Store handling jobs in HWP(K) Housing
Colony for the year 2011-12. |
| 27.05.2011 |
10.06.2011 |
14.06.2011 14:30 hrs. |
HWPK/I&C/LAN/2011/01
Estimated Cost: 4,37,950/-
|
Supply, Installation
& Testing of Ethernet Network Components at HWP(K). |
| 19.05.2011 |
03.06.2011 |
07.06.2011 15:00 hrs. |
HWPK/ELECT/COLONY/03/2011
Estimated Cost: 21,84,100/-
|
Supply, installation,
testing and guarantee of exhaust fans, ceiling fans and point
wiring in various type of residential quarters at HWP(K) Colony. |
| 02.05.2011 |
23.05.2011 |
26.05.2011 1430 hrs |
HWPK/Mech/Piping/2011/02
|
Fabrication,
welding & erection of pipelines for replacement of buried
drain header in H2S area & other pipelines in DU at HWPK
Site. |
| 26.04.2011 |
19.05.2011 |
25.05.2011 1400 hrs |
HWPM/M-P/CT/46/2010
|
Revamping of
Cooling tower at ETP of Main Plant during Major Turn Around
period in Heavy Water Plant (Manuguru) including supply of
required materials. |
| 25.04.2011 |
23.05.2011 |
25.05.2011 1400 hrs |
HWPM/E-P/VFD/MISC/NIT/2011
|
Miscellaneous
Electrical works like Excavation, HT and LT Cable removal,
re-routing, laying & termination and other associated
works for incorporation of VFDs in Main Plant. |
| 10.5.2011 |
19.05.2011 |
23.05.2011 14:30 hrs. |
HWP(K)/CIVIL/C-02/03/2011 |
Upkeeping
and Miscellaneous Works in HWP(K) Housing Colony for the year 2011-2012 |
| 04.05.2011 |
19.05.2011 |
23.05.2011 1430 hrs |
HWPK/ELECT/TENDER/ TF-OIL/2011
|
Maintenance of
transformers and filtration of transformer oil at HWP, Kota. |
| 10.04.2011 |
18.05.2011 |
21.05.2011 1430 hrs |
HWPK/Mech/2011/02
|
Removal of hot
Insulation from LSHS tank at HWP (K) Site. |
| 30.03.2011 |
03.05.2011 |
19.05.2011 1430 hrs |
HWPK/INST/2011/T-11
|
Design,
Engineering, Supply, Erection, Commissioning & Testing of
Level Monitoring System for LPG bullets at HWP (K). |
| 10.05.2011 |
13.05.2011 |
16.05.2011 14:30 Hrs. |
HWP(K)/CIVIL/P-06/07/2011 Estimated
Cost: Rs.15,00,000/- |
Annual
maintenance of lawns and gardens at HWPK Anushakti for the year 2011-2012 |
| 13.04.2011 |
30.04.2011 |
02.05.2011 1430 hrs |
HWPK/TSS/ISO/2011/01
|
Recertification
and Audit Services for Quality Management System-ISO 9001:2008
and Environmental Management System- ISO 14001:2004 for and at
Heavy Water Plant (Kota) and acquiring recertification
thereof. |