Supply, wiring, installation, testing and commissioning of Conventional Fire alarm panel and removal of existing panel at HWBF Vadodara.
Fabrication, wiring, Supply, Installation & Commissioning of control panel at KPLANT and laying of cable tray and instrument control cable at HWBF-Vadodara.
Supply, installation, trial run of curing heaters and auxiliary system for electrical curing of refractory lining and 80 KVA single phase heater system for 24 kA prototype sodium cell at Heavy Water Board Facilities – Vadodara (HWBF-V).
Last Updated: 06-06-2026