Annual Overhauling and Emergency repair of Steam generating units at CPP
Painting of Equipment, Pipes & Pipe Fittings, Vessels & Structures in CPP
HP Valves Overhauling during MTA 2024.
Residual life assessment of Industrial steel structures in CPP at Heavy Water Plant (Manuguru).
Maintenance of rotating equipments in XU-1& 2, ISG, LPG, SOTP and Drain Pit areas in Main Plant of HWP (M).
Internal Repair & Reconditioning of Exchange Unit Tower (3HT of XU-II) at Main Plant of HWPM
Overhauling and running maintenance of Milling System Equipment
Last Updated: 14-06-2026