HWPM/M-P/102/MTA-2020/22
Servicing and testing of Butterfly valves & check valves of Main cooling water pumps during MTA-2020 in Main plant of HWPM.
Servicing and testing of Butterfly valves & check valves of Main cooling water pumps during MTA-2020 in Main plant of HWPM.
Removal and re-erection of Control valves during MTA-2020 in Main plant of HWPM.
Supply of U-tubes and replacement of all U-tubes of 12-E-126/226 Heat exchanger Tube bundles in Main plant of HWPM.
Servicing and testing of safety valves during MTA-2020 in Main Plant of HWP (M).
Removal and re-erection of safety valves during MTA-2020 in Main plant of HWPM.
Miscellaneous Piping, weld repair & fabrication, flange joint maintenance, valve dropping & erection and other miscellaneous works in Utility area during MTA-2020.
Piping & Structural fabrication works in connection with various approved modifications during MTA-2020 in XU-II in Main Plant of Heavy Water Plant (Manuguru).
Last Updated: 14-06-2026