HWBF/TAL/SE/2024/01
Inspection, hydrostatic pressure test (HPT)/ hydrostatic stretch test of Breathing Air Cylinders & Oxygen Cylinders along with supply & installation of spare parts and minor repair of BA Set and filling of Oxygen Cylinders.
Inspection, hydrostatic pressure test (HPT)/ hydrostatic stretch test of Breathing Air Cylinders & Oxygen Cylinders along with supply & installation of spare parts and minor repair of BA Set and filling of Oxygen Cylinders.
Comprehensive Maintenance Contract of X Ray Baggage Scanner working at HWP (K) Site for 3year.
Laying of OFC cable and termination for PA system at HWP(K)
Calibration of Secondary Standard Instruments
Preventive and breakdown maintenance of Ceiling Fans, Pedestal Fans, Air Circulators, Exhaust Fans and Air Coolers at mainplant for two years.
Annual maintenance of Auxiliary Boiler at Main Plant of HWP (M) for
the year 2024
Rewinding of 90 kW,415 Volts, 3 phase Induction Motor
Last Updated: 14-06-2026