HWPT/MECH/2026/1095
Fabrication and erection of Piping support & Structural support works at HWPT.
Fabrication and erection of Piping support & Structural support works at HWPT.
Corrosion resistant coating on mist cooling system headers & cooling tower area pipelines as per enclosed specifications at HWBF (VADODARA).
Removal of valve from plant installation, shifting, maintenance, testing and re-installation at HWBF (VADODARA).
Supply and Apply of Pipeline Wrap Coat Externally of HWPM.
Complete Overhauling work of Vertical Turbine type Pumps, Single & Multi stage centrifugal pumps in RWIT, RWTP, ERPH, DM plant, Filter Water Pump house and ETP area.
Erection & de-erection of temporary platforms work at HWP (Tuticorin).
Erection of approach platform on product storage vessels and erection of transfer and utility pipelines from SPP to product storage vessels at HWPT.
Supply and Application of cold Insulation( insitu injection method) in main plant, at HWPT.
Annual maintenance of Auxiliary Boiler at Main Plant of HWP (M) for the year-2026.
Painting of Equipments, pipe lines, structures, tanks and vessels in H2S Generation unit , Na2SO4 recovery , PTP area and R&M shop.
Last Updated: 05-06-2026