Replacement of PP Flanges with FRP Flanges in existing pipelines, Measurement & Fabrication of spare spools, reducer/expander, Tees, pipe fittings etc. and FRP Lining application on pump foundations, tank structural supports etc. at HWPK site.
Preparation and Removal of Temporary Scaffoldings at HWPK site.
Removal of existing rubber lining, grit blasting and Re-Rubber Lining on inside surface of Layered Bed Cation Vessels and Strong Base Anion Vessel at HWP(K) Plant Site.
Cable laying for VFDs and other miscellaneous electrical works at Main plant.