HWPK/MECH/2019/255A
Re-babbiting of journal bearing and tilting pads of H2S gas Centrifugal compressor and Process Feed Water Pump at HWPK Site.
Re-babbiting of journal bearing and tilting pads of H2S gas Centrifugal compressor and Process Feed Water Pump at HWPK Site.
Painting of DM plant, CCW System, piperacks & TG building equipment-vessels, pipes, structures etc.
Annual Maintenance of Earth pits and misc. works of CPP, HWPM.
Resurfacing of road from main gate to OHT (MP) and other areas at HWPM.
Repairs to pitching, grass turfing and strengthening of slopes of Ash pond from chainage 0 to 500 at HWP (Manuguru).
Providing concrete lining to upstream side of Ash pond - 2 bund (+65 to +68 Level) from chainage 500 to 950 at HWP (Manuguru).
Assistance Contract in carrying out the Maintenance of Electrical MCC’s, Panels & Equipment’s during Shutdown MTA:2020.
Last Updated: 19-06-2026