HWPM/EU/AMC/2024/03/NIT dated 16 / 05 / 2024
Annual Electrical Maintenance Works at Captive Power Plant, HWP, Manuguru during the period 2024-25
Annual Electrical Maintenance Works at Captive Power Plant, HWP, Manuguru during the period 2024-25
Providing RCC Grade Slab and RCC dykes (for 6 tanks) in D20-8 area at HWPM. (Phase-I)
Comprehensive Maintenance Contract of IT inventory, Video conferencing system and network devices (active and passive) at HWPM for 2024-2025
Hot insulation works in XU-1 & 2, LPG, ISG, H2S and Flare stack areas at Main Plant of HWPM
Calibration of Secondary Standard Instruments
Preventive and breakdown maintenance of Ceiling Fans, Pedestal Fans, Air Circulators, Exhaust Fans and Air Coolers at mainplant for two years.
Annual maintenance of Auxiliary Boiler at Main Plant of HWP (M) for
the year 2024
Last Updated: 13-06-2026