HWPM/MU/W/BG/2402//R0
Rubber lining of Hydro Chloric Acid storage tank SHL-3 & 4 in DM Plant at CPP.
Rubber lining of Hydro Chloric Acid storage tank SHL-3 & 4 in DM Plant at CPP.
Annual Overhauling and Emergency repair of Steam generating units at CPP
Painting of Equipment, Pipes & Pipe Fittings, Vessels & Structures in CPP
HP Valves Overhauling during MTA 2024.
Residual life assessment of Industrial steel structures in CPP at Heavy Water Plant (Manuguru).
Maintenance of rotating equipments in XU-1& 2, ISG, LPG, SOTP and Drain Pit areas in Main Plant of HWP (M).
Last Updated: 20-11-2026