HWP/B/MECH/21-22/TS-929A
Fabrication and supply of 15 MT capacity FRV-FRP tank for Caustic Lye.
Fabrication and supply of 15 MT capacity FRV-FRP tank for Caustic Lye.
Annual Maintenance Contract for Calibration of Gas Detection System at HWP (Baroda).
Annual Maintenance Contract for Calibration of Gas Detection System
at HWBF-V
LT cable fault locating at jointing at HWP, Talcher.
Providing, Fabricating, Safe Supply, Erecting and Commissioning of Fume hood and Spot Extractor at reactor & hot room of PC & AL, HWP(Baroda).
Preparation of civil engineering design and drawings through Outsourcing for the year 2019 –20.
Comprehensive Annual Maintenance Contract for Personnel Computers, Printers and Peripherals.
Last Updated: 22-09-2026