HWPM/CIVIL/COL/NIT/2020/13
Installation of floating 3 Sequence fountain in water body at HWP (M) colony.
Installation of floating 3 Sequence fountain in water body at HWP (M) colony.
Assistance in maintenance and operation of workshop machines including valves, servicing works in R&M shop at main plant of HWP (M).
Maintenance of PC / CLF & Gear Boxes and Miscellaneous works in Utility-2 area of Main Plant of HWP (M).
Miscellaneous maintenance works in Boron Plant.
Impact Echo Testing for Foundation bolts of XU-I boosters, Towers of XU-I & II at Heavy Water Plant, Manuguru.
Assistance in maintenance of field instruments in main plant of HWPM.
Collection, Transportation and Safe Delivery of 1500 MT of Furnace Oil from Visakapatnam to Heavy Water Plant (Manuguru) in Road Tankers for a period of 18 Calendar Months on as and when required basis.
Repairs to the toe drains and miscellaneous works in Ash Pond-I & II at HWPM.
Last Updated: 22-09-2026