HWPK/MECH/2022/309
Preparation and Removal of Temporary Scaffoldings at HWPK site.
Preparation and Removal of Temporary Scaffoldings at HWPK site.
Removal of existing rubber lining, grit blasting and Re-Rubber Lining on inside surface of Layered Bed Cation Vessels and Strong Base Anion Vessel at HWP(K) Plant Site.
Bienniel Contract for internal painting of Residential quarters at HWPK housing colony, Rawatbhata for the year 2022-23.
Miscellaneous civil maintenance works at HWP(K) Plant site for the year 2022-23.
Bienniel Contract for Sweeping of Roads and cleaning of Drains in HWPK Housing Colony for the year 2022-23.
Annual Maintenance Contract for preventive maintenance, handling, shifting, removal and re-fixing of Limitorque Actuators Control Valves and Level Gauges and Maintenance of Telephone Lines at HWPK for two year period.
Supply of spare components and Replacement of Damaged Components in Induced Draft Pultruded FRP Counter Flow Cooling Tower at Heavy Water Plant (Kota) site.
Laying & termination of 400 Sq mm power cable from MRS to booster area and other various size LT cables and removal of old cables at HWPK
Last Updated: 23-07-2026