Removal of existing damaged hot insulation, fixing of hot insulation on piping, vessels and heat exchangers including supply and application of painting during MTA2020 in Main Plant of Heavy Water Plant, Manuguru.
Annual maintenance of 440/230 Volts Power Distribution system in HWP(M) Colony.
Re-babbiting of journal bearing and tilting pads of H2S gas Centrifugal compressor and Process Feed Water Pump at HWPK Site.
Resurfacing of road from main gate to OHT (MP) and other areas at HWPM.
Repairs to pitching, grass turfing and strengthening of slopes of Ash pond from chainage 0 to 500 at HWP (Manuguru).
Providing concrete lining to upstream side of Ash pond - 2 bund (+65 to +68 Level) from chainage 500 to 950 at HWP (Manuguru).
Last Updated: 25-07-2026