Jul-2009

Inauguration of Boron Enrichment Plant by Dr. S. Banerjee, then Director BARC in presence of Chairman, AEC and CE, HWB at HWP, Manuguru

14-May-2009

Commissioning of Mist Cooling System at HWP, Kota

28-Jun-2008

Commissioning of Vapor Absorption-Refrigeration System at HWP, Manuguru

Jun-2008

Installation of one additional distillation unit (DU) column taken up to cope up with the enhanced feed processing in XUs at HWP, Manuguru

Aug-2007

H2S gas recovery from sour oil system commissioned at HWP, Manuguru

25-Feb-2007

First export of Heavy Water for non-nuclear application (to M/s Spectra Gases Inc. USA.)

14-Sep-2006

Steam line from RAPS 3 &4 commissioned at HWP, Kota

Sep-2006

Power Export started for the first time from CPP, HWP, Manuguru

16-Sep-2006

First supply D2 gas for non-nuclear application (to M/s Sterlite)

14-Jul-2006

Pilot scale production of 3rdSolvent TOPO[TOPS-08] at HWP, Talcher