2008 |
Installation of one additional distillation unit (DU) column taken up to cope up with the enhanced feed processing in XUs at HWP, Manuguru |
2007 |
H2S gas recovery from sour oil system commissioned at HWP, Manuguru |
25-Feb-2007 |
First export of Heavy Water for non-nuclear application (to M/s Spectra Gases Inc. USA.) |
14-Sep-2006 |
Steam line from RAPS 3 &4 commissioned at HWP, Kota |
2006 |
Power Export started for the first time from CPP, HWP, Manuguru |
16-Sep-2006 |
First supply D2 gas for non-nuclear application (to M/s Sterlite) |
14-Jul-2006 |
Pilot scale production of 3rdSolvent TOPO[TOPS-08] at HWP, Talcher |
15-Jan-2006 |
First Sodium metal collection at Sodium Metal Plant, HWP, Manuguru |
2005 |
First consignment of TBP from Talcher to NRG, Tarapur. |
06-Nov-2004 |
Then Chairman (AEC), Dr. Anil Kakodkar inaugrated the Vapour Abosrption Refrigeration System and laid Foundation Stone for Sodium Metal Production Facility & poured concrete for equipment foundation for Boron Enrichment facility at HWP (Manuguru). |